PHL Operation
| # | Nama | Jam | Shift | Status hadir | Progress | Tugas terakhir |
|---|---|---|---|---|---|---|
| 1 | Andrio Rizki Anarghya | 8h | — | HADIR17:00 | 0/1 (0%) Selesai: 10h 12m · Belum: 5h 48m | ONGOING08 Jul 2026#1397353 ERCS DCAM - Loadbank Panel PPC |
| 2 | Arry Susanto | 10h | — | HADIR07:44 | 0/9 (0%) Selesai: 0h · Belum: 12h | ONGOING08 Jul 2026#1429629 ATOZ - Dakota Electrical Fitout (Batam) PPC |
| 3 | Dedi Supriyadi | 8h | — | HADIR17:01 | 0/1 (0%) Selesai: 10h 12m · Belum: 5h 48m | ONGOING08 Jul 2026#1397353 ERCS DCAM - Loadbank Panel PPC |
| 4 | Idan Wanda Pratama | 8h | — | HADIR16:01 | 0/2 (0%) Selesai: 0h · Belum: 8h | ONGOING08 Jul 2026#1495897 PT Roka Lane Asia - Rack Server 52U DWDM MMR PPC |
| 5 | Muhammad Firmansyah | 8h | — | HADIR17:08 | 0/8 (0%) Selesai: 0h · Belum: 15h | ONGOING08 Jul 2026#1429629 ATOZ - Dakota Electrical Fitout (Batam) PPC |
| 6 | Indradjidt | 8h | — | HADIR17:07 | 1/1 (100%) Selesai: 16h · Belum: 0h | DONE08 Jul 2026#14037874 Plan WO pekerjaan operator workshop |
| 7 | Imam Mudin | — | — | BELUM | 0/0 | CARRY-OVER26 Jun 2026#1429629 ATOZ - Dakota Electrical Fitout (Batam) PPC |
| 8 | Iyan Sopian Sidik | — | — | BELUM | 0/0 | CARRY-OVER26 Jun 2026#1429629 ATOZ - Dakota Electrical Fitout (Batam) PPC |
| 9 | Ubaidillah PHL | — | — | BELUM | 0/0 | CARRY-OVER26 Jun 2026#1429629 ATOZ - Dakota Electrical Fitout (Batam) PPC |
| 10 | wawan Diana | — | — | BELUM | 0/0 | CARRY-OVER26 Jun 2026#1429629 ATOZ - Dakota Electrical Fitout (Batam) PPC |