Tugas — Finance

Finance · 75 job · 177 telat

Finance FAT

Done On progress Overdue Outstanding
75 job · 248 aktivitas · 177 telat
Nama ProjectAktivitas 1Aktivitas 2Aktivitas 3Aktivitas 4Aktivitas 5Aktivitas 6Aktivitas 7Aktivitas 8Aktivitas 9Highest Delay
Internal - Stock Rack Server Moratel & DCPDUProduct + InstalasiDeadline: Jan 30, 20260/9 aktivitas selesaiDP (Otomisasi)Overdue0/25moPlan: Jan 25–Jan 26BAST/GR Kelengkapan Inv yg readyOverdue0/16moPlan: Jan 16–Jan 19Invoice 100%Overdue0/15moPlan: Feb 2–Feb 3Invoice Base On Progres (%)Overdue0/16moPlan: Jan 19–Jan 19Invoice RetensiOverdue0/15moPlan: Feb 6–Feb 7Payment DPOverdue0/16moPlan: Jan 20–Jan 21Payment ProgresOverdue0/16moPlan: Jan 21–Jan 21Payment 100%Overdue0/16moPlan: Jan 21–Jan 22Payment RetensiOverdue0/16moPlan: Jan 22–Jan 226mo
Shimizu - Loadbank IRISProduct + InstalasiDeadline: Feb 22, 20260/9 aktivitas selesaiDP (Otomisasi)Overdue0/16moPlan: Jan 14–Jan 15BAST/GR Kelengkapan Inv yg readyOverdue0/16moPlan: Jan 15–Jan 18Invoice 100%Overdue0/16moPlan: Jan 18–Jan 19Invoice Base On Progres (%)Overdue0/16moPlan: Jan 18–Jan 18Invoice RetensiOverdue0/16moPlan: Jan 19–Jan 19Payment DPOverdue0/16moPlan: Jan 19–Jan 20Payment ProgresOverdue0/16moPlan: Jan 20–Jan 20Payment 100%Overdue0/16moPlan: Jan 20–Jan 21Payment RetensiOverdue0/16moPlan: Jan 21–Jan 216mo
Schneider - Panel for PUSRI IIIB Project // E2010-96440Product + InstalasiDeadline: May 26, 20260/9 aktivitas selesaiDP (Otomisasi)Overdue0/17moPlan: Dec 11–Dec 12BAST/GR Kelengkapan Inv yg readyOverdue0/17moPlan: Nov 25–Nov 28Invoice 100%On Progress0/1Plan: Jul 14–Jul 14Invoice Base On Progres (%)Overdue0/17moPlan: Nov 28–Nov 28Invoice RetensiOverdue0/17moPlan: Dec 23–Dec 24Payment DPOverdue0/17moPlan: Nov 29–Nov 30Payment ProgresOverdue0/17moPlan: Nov 30–Nov 30Payment 100%Overdue0/17moPlan: Nov 30–Dec 1Payment RetensiOverdue0/17moPlan: Dec 1–Dec 17mo
Hitachi - ACP25035 - GI Satui 150kVProduct + InstalasiDeadline: Jun 19, 20261/9 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Mar 2–Mar 3BAST/GR Kelengkapan Inv yg readyOverdue0/15moPlan: Feb 3–Feb 4Invoice 100%Done1/1Plan: Mar 15–Mar 15Actual: Mar 15Invoice Base On Progres (%)Overdue0/15moPlan: Feb 4–Feb 5Invoice RetensiOverdue0/24moPlan: Mar 5–Mar 6Payment DPOverdue0/15moPlan: Feb 6–Feb 6Payment ProgresOverdue0/25moPlan: Feb 6–Feb 9Payment 100%Overdue0/25moPlan: Feb 9–Feb 9Payment RetensiOverdue0/25moPlan: Feb 9–Feb 105mo
Hitachi - ACP25026 - BalonganProduct + InstalasiDeadline: Jul 20, 20261/9 aktivitas selesaiDP (Otomisasi)Overdue0/15moPlan: Jan 26–Jan 27BAST/GR Kelengkapan Inv yg readyOverdue0/16moPlan: Dec 30–Dec 31Invoice 100%Done1/1Plan: Mar 9–Mar 9Actual: Mar 9Invoice Base On Progres (%)Overdue0/16moPlan: Dec 31–Jan 1Invoice RetensiOverdue0/15moPlan: Jan 29–Jan 30Payment DPOverdue0/16moPlan: Jan 2–Jan 2Payment ProgresOverdue0/16moPlan: Jan 2–Jan 5Payment 100%Overdue0/16moPlan: Jan 5–Jan 5Payment RetensiOverdue0/16moPlan: Jan 5–Jan 66mo
Forecast - Open Rack, Subrack, BB45UProduct OnlyDeadline: Sep 20, 20240/7 aktivitas selesaiDP (Otomisasi)Overdue0/121moPlan: Oct 15–Oct 16Pre InvoiceOverdue0/121moPlan: Oct 9–Oct 11InvoiceOverdue0/121moPlan: Oct 11–Oct 14Invoice 100%Overdue0/121moPlan: Oct 21–Oct 22Invoice Base On Progres (%)Overdue0/121moPlan: Oct 18–Oct 21Invoice RetensiOverdue0/121moPlan: Oct 22–Oct 22Plan Submit InvoiceOverdue0/121moPlan: Oct 17–Oct 18--21mo
Kelinci Mas - DSS TallolamaProduct OnlyDeadline: Aug 7, 20262/9 aktivitas selesaiDP (Otomisasi)Done1/1Plan: Dec 17–Dec 17Actual: Dec 5BAST/GR Kelengkapan Inv yg readyOverdue0/17moPlan: Dec 17–Dec 17Invoice 100%Done1/1Plan: Dec 17–Dec 17Actual: Dec 5Invoice Base On Progres (%)Overdue0/17moPlan: Dec 17–Dec 17Invoice RetensiOverdue0/17moPlan: Dec 17–Dec 17Payment DPOverdue0/17moPlan: Dec 17–Dec 17Payment ProgresOverdue0/17moPlan: Dec 17–Dec 17Payment 100%Overdue0/17moPlan: Dec 17–Dec 17Payment RetensiOverdue0/17moPlan: Dec 17–Dec 177mo
MECHANICAL PROSESProduct OnlyDeadline: Oct 12, 20220/3 aktivitas selesaiPre InvoiceOverdue0/1742moPlan: Feb 7–Feb 9InvoiceOverdue0/1741moPlan: Feb 9–Feb 13PaymentOverdue0/2841moPlan: Nov 14–Feb 14------42mo
PRODUCT & DEVELOPMENTProduct OnlyDeadline: Oct 12, 20220/3 aktivitas selesaiPre InvoiceOverdue0/342moPlan: Nov 9–Jan 23InvoiceOverdue0/342moPlan: Nov 11–Jan 25PaymentOverdue0/342moPlan: Nov 14–Jan 26------42mo
ELEC_ LV_SYSTEMProduct OnlyDeadline: Oct 27, 20220/3 aktivitas selesaiPre InvoiceOverdue0/142moPlan: Jan 26–Jan 30InvoiceOverdue0/142moPlan: Jan 30–Feb 1PaymentOverdue0/142moPlan: Feb 1–Feb 2------42mo
GSPE_STOK BOX PANEL MORATELProduct + InstalasiDeadline: Aug 13, 20250/3 aktivitas selesaiDP (Otomisasi)Overdue0/39moPlan: Oct 3–Oct 8Invoice 100%Overdue0/39moPlan: Oct 6–Oct 10Invoice RetensiOverdue0/39moPlan: Oct 8–Oct 13------9mo
Forecast_Stock Panel Hitachi IP42 & IP54Product + InstalasiDeadline: Oct 10, 20250/3 aktivitas selesaiDP (Otomisasi)Overdue0/38moPlan: Nov 6–Nov 10Invoice 100%Overdue0/38moPlan: Nov 10–Nov 12Invoice RetensiOverdue0/38moPlan: Nov 12–Nov 13------8mo
PTT - Module MPTT DPC 3000 HE (25 unit)Product + InstalasiDeadline: Dec 19, 20250/3 aktivitas selesaiDP (Otomisasi)Overdue0/15moPlan: Jan 30–Jan 30Invoice 100%Overdue0/17moPlan: Dec 22–Dec 22Invoice RetensiOverdue0/25moPlan: Feb 2–Feb 4------7mo
Internal - Micro Data Centre EatonProduct + InstalasiDeadline: Jan 23, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/15moPlan: Feb 2–Feb 2Invoice 100%Overdue0/15moPlan: Feb 2–Feb 4Invoice RetensiOverdue0/15moPlan: Feb 4–Feb 6------5mo
BDX - CGK1_RACK SERVER & rPDUProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue2/45moPlan: Dec 22–Feb 16Actual: Dec 24Invoice 100%Overdue0/4Plan: Feb 16–Aug 18Invoice RetensiOverdue0/3Plan: Feb 18–Jul 13------5mo
Internal - Layout Penambahan Unit Mesin HSGProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Mar 16–Mar 16Invoice 100%Overdue0/14moPlan: Mar 16–Mar 18Invoice RetensiOverdue0/14moPlan: Mar 18–Mar 20------4mo
PT Telin - Instalasi CLS PluitProduct + InstalasiDeadline: Feb 26, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Mar 30–Apr 1Invoice 100%Overdue0/13moPlan: Apr 1–Apr 3Invoice RetensiOverdue0/13moPlan: Apr 3–Apr 6------3mo
Job LeaderProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/16moPlan: Jan 2–Jan 5Invoice 100%Overdue0/16moPlan: Jan 5–Jan 7Invoice RetensiOverdue0/16moPlan: Jan 7–Jan 8------6mo
Internal - Project ISO_27001Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/34moPlan: Mar 16–Mar 16Invoice 100%Overdue0/14moPlan: Mar 16–Mar 18Invoice RetensiOverdue0/14moPlan: Mar 18–Mar 20------4mo
Internal - Program Estimator (Containment, Container, Smart Rack)Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Mar 16–Mar 18Invoice 100%Overdue0/14moPlan: Mar 18–Mar 20Invoice RetensiOverdue0/14moPlan: Mar 20–Mar 23------4mo
Internal - Automation Program CRM Section 1-4Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Mar 16–Mar 18Invoice 100%Overdue0/14moPlan: Mar 18–Mar 20Invoice RetensiOverdue0/14moPlan: Mar 20–Mar 23------4mo
Internal - 29 Line AssemblyProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/26moPlan: Jan 24–Jan 24Invoice 100%Overdue0/15moPlan: Jan 24–Jan 28Invoice RetensiOverdue0/15moPlan: Jan 28–Jan 30------6mo
Internal - Perbaikan Loading/Unloading Area Pintu BelakangProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/23moPlan: Apr 21–Apr 21Invoice 100%Overdue0/13moPlan: Apr 21–Apr 23Invoice RetensiOverdue0/12moPlan: Apr 23–Apr 25------3mo
Review Product Presentation - Marketing UpdateProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Feb 28–Feb 28Invoice 100%Overdue0/14moPlan: Feb 28–Mar 2Invoice RetensiOverdue0/14moPlan: Mar 2–Mar 4------4mo
Mega Akses - POP Tegal Cangkring-Bali (Add Battery)Product + InstalasiDeadline: Mar 13, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Mar 9–Mar 11Invoice 100%Overdue0/14moPlan: Mar 11–Mar 13Invoice RetensiOverdue0/14moPlan: Mar 13–Mar 16------4mo
Internal - Mini Data Center Rack (MDCR) from ScheneiderProduct + InstalasiDeadline: Mar 27, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/14moPlan: Mar 19–Mar 19Invoice 100%Overdue0/14moPlan: Mar 19–Mar 21Invoice RetensiOverdue0/14moPlan: Mar 21–Mar 23------4mo
Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KWProduct + InstalasiDeadline: Mar 31, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/15moPlan: Jan 30–Jan 31Invoice 100%Overdue0/15moPlan: Jan 31–Feb 2Invoice RetensiOverdue0/25moPlan: Feb 2–Feb 6------5mo
GSPE_Smart Rack (Micro Data Center)Product + InstalasiDeadline: Apr 6, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/25moPlan: Sep 19–Feb 12Invoice 100%Overdue0/25moPlan: Sep 19–Feb 15Invoice RetensiOverdue0/45moPlan: Sep 22–Feb 17------5mo
Mega Akses - Req.Battery - JABODETABEKProduct + InstalasiDeadline: Apr 10, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Mar 26–Mar 30Invoice 100%Overdue0/13moPlan: Mar 30–Apr 1Invoice RetensiOverdue0/13moPlan: Apr 1–Apr 2------3mo
INTERNAL | - MDCC Trial Full Schneider Device - ContainerProduct + InstalasiDeadline: Apr 20, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/94moPlan: Feb 2–Mar 20Invoice 100%Overdue0/174moPlan: Feb 4–Mar 22Invoice RetensiOverdue0/114moPlan: Feb 6–Mar 24------4mo
Internal - Smart rPDUProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/15moPlan: Feb 20–Feb 20Invoice 100%Overdue0/15moPlan: Feb 20–Feb 22Invoice RetensiOverdue0/14moPlan: Feb 22–Feb 24------5mo
Mega Akses - BDF Power Tanah Merah (Add Battery)Product + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 6–Apr 8Invoice 100%Overdue0/13moPlan: Apr 8–Apr 10Invoice RetensiOverdue0/13moPlan: Apr 10–Apr 13------3mo
Schneider Electric - LNGPPProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 23–Apr 23Invoice 100%Overdue0/12moPlan: Apr 27–Apr 29Invoice RetensiOverdue0/12moPlan: Apr 27–Apr 29------3mo
BDX - CGK1_Panel PDUProduct + InstalasiDeadline: May 21, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue1/25moPlan: Feb 9–Feb 15Actual: Dec 22Invoice 100%Overdue0/2Plan: Feb 9–Aug 12Invoice RetensiOverdue0/2Plan: Feb 11–Jul 18------5mo
Internal - Forecast Rack Server : (42U, 45U, 52U)Product + InstalasiDeadline: May 29, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/32moPlan: Apr 9–May 15Invoice 100%Overdue0/32moPlan: Apr 9–May 17Invoice RetensiOverdue0/32moPlan: Apr 11–May 19------2mo
Siemens - UCC BP TangguhProduct + InstalasiDeadline: May 29, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 2–Apr 6Invoice 100%Overdue0/13moPlan: Apr 6–Apr 8Invoice RetensiOverdue0/13moPlan: Apr 8–Apr 9------3mo
Kelinci Mas Unggul - Panel MK Single PhiProduct + InstalasiDeadline: Jun 10, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13wPlan: Jun 15–Jun 17Invoice 100%Overdue0/13wPlan: Jun 17–Jun 19Invoice RetensiOverdue0/12wPlan: Jun 19–Jun 22------3w
Internal - MDCC 20 Feet POD Phase 2/IP65Product + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/12moPlan: May 22–May 22Invoice 100%Overdue0/11moPlan: May 22–May 25Invoice RetensiOverdue0/21moPlan: May 25–May 27------2mo
Internal - Contaiment 50 UnitProduct + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 4–Apr 4Invoice 100%Overdue0/13moPlan: Apr 4–Apr 7Invoice RetensiOverdue0/23moPlan: Apr 7–Apr 9------3mo
Internal - Pembuatan Bak Treatment, Hoist, Oven dan TrolleyProduct + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/44moPlan: Mar 2–Mar 19Invoice 100%Overdue0/34moPlan: Mar 2–Mar 21Invoice RetensiOverdue0/34moPlan: Mar 4–Mar 23------4mo
PT. NexWave_Panel TXDP & SDP AC_PO25090188Product + InstalasiDeadline: Jul 3, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/12wPlan: Jun 24–Jun 24Invoice 100%Overdue0/11wPlan: Jun 26–Jun 28Invoice RetensiOverdue0/21wPlan: Jun 26–Jun 28------2w
Inti Bumi Mas - Panel FeederProduct + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 20–Apr 22Invoice 100%Overdue0/13moPlan: Apr 22–Apr 24Invoice RetensiOverdue0/12moPlan: Apr 24–Apr 27------3mo
Mega Akes - HUB Majalengka (Add Battery)Product + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 6–Apr 8Invoice 100%Overdue0/13moPlan: Apr 8–Apr 10Invoice RetensiOverdue0/13moPlan: Apr 10–Apr 13------3mo
Mega Akses - Omadata SurabayaProduct + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/13wPlan: Jun 15–Jun 15Invoice 100%Overdue0/13wPlan: Jun 17–Jun 19Invoice RetensiOverdue0/13wPlan: Jun 17–Jun 19------3w
Demo/Mockup Panel Typetest Cubic, Eaton MV, Eaton LVProduct + InstalasiDeadline: Aug 31, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/34moPlan: Mar 16–Mar 16Invoice 100%Overdue0/44moPlan: Mar 16–Mar 18Invoice RetensiOverdue0/34moPlan: Mar 18–Mar 20------4mo
Intan Mufakat Raya - GIS 150 KV Gandul II/PamulangProduct + InstalasiDeadline: Jun 10, 20260/2 aktivitas selesaiDP (Otomisasi)Overdue0/13moPlan: Apr 16–Apr 20Invoice 100%Overdue0/13moPlan: Apr 20–Apr 22-------3mo
Hitachi - ACP25085 - Sebuku PLN NPCProduct + InstalasiDeadline: Jul 6, 20260/3 aktivitas selesaiDP (Otomisasi)Overdue0/16dPlan: Jul 2–Jul 2Invoice 100%Overdue0/12wPlan: Jun 25–Jun 25Invoice RetensiOn Progress0/2Plan: Jul 6–Jul 8------2w
ENGINEERING OPRASIONAL 2022Product OnlyDeadline: Jun 9, 20220/1 aktivitas selesaiPaymentOverdue0/748moPlan: Jun 16–Jul 20--------48mo
Hitachi - ACP25053 - DSS Maumere 150kVProduct + InstalasiDeadline: Jul 6, 20260/1 aktivitas selesaiInvoice 100%Overdue0/11wPlan: Jul 1–Jul 1--------1w
Hitachi - ACP26018 - GI KM17 Borneo IndobaraProduct + InstalasiDeadline: Jul 30, 20260/1 aktivitas selesaiInvoice 100%Overdue0/12wPlan: Jun 26–Jun 26--------2w
Moratel - Baterry Enersys 100 Ah PO 165347 - (300 Blok)Product OnlyDeadline: Aug 28, 20251/1 aktivitas selesaiInvoice 100%Done1/1Plan: Sep 2–Sep 2Actual: Sep 2--------
PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - SentulProduct + InstalasiDeadline: Jun 1, 20261/3 aktivitas selesaiDP (Otomisasi)Done1/1Plan: Mar 5–Mar 11Actual: Mar 6Invoice 100%On Progress0/1Plan: Jun 23–Oct 15Invoice RetensiOn Progress0/1Plan: Jan 18–Jan 20------
PSN - Rack 20U UPS Hybrid + InverterProduct + InstalasiDeadline: Jun 3, 20260/1 aktivitas selesaiInvoice 100%On Progress0/1Plan: Aug 3–Aug 3--------
Hitachi - ACP25076 - Single Phi BarruProduct + InstalasiDeadline: Jun 16, 20261/1 aktivitas selesaiInvoice 100%Done1/11moPlan: Apr 10–Apr 10Actual: May 11--------1mo
Wholesale - Panel DB - Dermaga BiakProduct + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 6–Jul 8Invoice 100%On Progress0/1Plan: Jul 8–Jul 10Invoice RetensiOn Progress0/1Plan: Jul 10–Jul 13------
MIG - PO-26-0171 - Project Alladin Panel S110 & S510 - Panel DistributionProduct + InstalasiDeadline: Jul 8, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 31–Sep 2Invoice 100%On Progress0/1Plan: Sep 2–Sep 4Invoice RetensiOn Progress0/1Plan: Sep 4–Sep 7------
Ekamas Mora Republik - POP Villa Beji Bali_ACPDB & DCPDBProduct + InstalasiDeadline: Jul 10, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 17–Aug 19Invoice 100%On Progress0/1Plan: Aug 19–Aug 21Invoice RetensiOn Progress0/1Plan: Aug 21–Aug 24------
Hitachi - ACP25029 - GI Tolinggula 150kVProduct + InstalasiDeadline: Jul 13, 20261/1 aktivitas selesaiInvoice 100%Done1/13wPlan: Apr 27–Apr 27Actual: May 21--------3w
Inti Bumi Mas - Panel VFD 132KWProduct + InstalasiDeadline: Jul 22, 20261/2 aktivitas selesaiDP (Otomisasi)Done1/1Plan: Dec 24–Dec 24Actual: Dec 24Invoice 100%On Progress0/1Plan: Jul 20–Jul 20-------
Hitachi - GI 150kV kruengProduct + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 27–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Jul 31Invoice RetensiOn Progress0/1Plan: Jul 31–Aug 3------
PT. LTI_PO 26060314_ODC With Aircond 300W (1 Unit)Product + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 13–Aug 17Invoice 100%On Progress0/1Plan: Aug 17–Aug 19Invoice RetensiOn Progress0/1Plan: Aug 19–Aug 20------
Pembuatan Robot AGVProduct + InstalasiDeadline: Jul 24, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 29–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Aug 2Invoice RetensiOn Progress0/1Plan: Aug 2–Aug 4------
ATOZ - Dakota Electrical Fitout (Batam)Product + InstalasiDeadline: Jul 24, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 23–Jul 27Invoice 100%On Progress0/1Plan: Jul 27–Jul 29Invoice RetensiOn Progress0/1Plan: Jul 29–Jul 30------
BDX CGK3 - Electrical MaterialProduct + InstalasiDeadline: Jul 24, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 27–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Jul 31Invoice RetensiOn Progress0/1Plan: Jul 31–Aug 3------
DNA Teknologi Indonesia - Caging System DHIProduct + InstalasiDeadline: Jul 28, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 30–Aug 3Invoice 100%On Progress0/1Plan: Aug 3–Aug 5Invoice RetensiOn Progress0/1Plan: Aug 5–Aug 6------
Hitachi - ACP25099 - GI 150kV TakengonProduct + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 27–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Jul 31Invoice RetensiOn Progress0/1Plan: Jul 31–Aug 3------
Ekamas Mora Republik - Open Rack 42U & Rack DCPDU 3U_PO# 174372Product + InstalasiDeadline: Aug 7, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 10–Aug 12Invoice 100%On Progress0/1Plan: Aug 12–Aug 14Invoice RetensiOn Progress0/1Plan: Aug 14–Aug 17------
Hitachi - ACP25105 - Seko IndokomasProduct + InstalasiDeadline: Aug 12, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 27–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Jul 31Invoice RetensiOn Progress0/1Plan: Jul 31–Aug 3------
PT Roka Lane Asia - Rack Server 52U DWDM MMRProduct + InstalasiDeadline: Aug 21, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 13–Aug 17Invoice 100%On Progress0/1Plan: Aug 17–Aug 19Invoice RetensiOn Progress0/1Plan: Aug 19–Aug 20------
ERCS DCAM - Loadbank PanelProduct + InstalasiDeadline: Aug 24, 20261/2 aktivitas selesaiDP (Otomisasi)Done1/1Plan: May 15–May 22Actual: May 20Invoice 100%On Progress0/1Plan: Aug 24–Aug 28-------
Hitachi - GI 150kV SribawonoProduct + InstalasiDeadline: Aug 25, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 27–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Jul 31Invoice RetensiOn Progress0/1Plan: Jul 31–Aug 3------
Hitachi - GI 150kV KolakaProduct + InstalasiDeadline: Aug 28, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Jul 27–Jul 29Invoice 100%On Progress0/1Plan: Jul 29–Jul 31Invoice RetensiOn Progress0/1Plan: Jul 31–Aug 3------
Mega Akses Persada - BDF Power Papahan KaranganyarProduct + InstalasiDeadline: Aug 28, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 5–Aug 7Invoice 100%On Progress0/1Plan: Aug 7–Aug 9Invoice RetensiOn Progress0/1Plan: Aug 9–Aug 12------
Rumah Data Kita CGK11 - Rack Server 45UProduct + InstalasiDeadline: Sep 11, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 27–Aug 31Invoice 100%On Progress0/1Plan: Aug 31–Sep 2Invoice RetensiOn Progress0/1Plan: Sep 2–Sep 3------
Hitachi - ACP25111 - Muara Laboh Stage 2Product + InstalasiDeadline: Oct 23, 20260/3 aktivitas selesaiDP (Otomisasi)On Progress0/1Plan: Aug 27–Aug 31Invoice 100%On Progress0/1Plan: Aug 31–Sep 2Invoice RetensiOn Progress0/1Plan: Sep 2–Sep 3------