Tugas — PPC

PPC · 75 job · 169 telat

PPC PPC

Done On progress Overdue Outstanding
75 job · 243 aktivitas · 169 telat
Nama ProjectAktivitas 1Aktivitas 2Aktivitas 3Aktivitas 4Aktivitas 5Aktivitas 6Highest Delay
MECHANICAL PROSESProduct OnlyDeadline: Oct 12, 20220/4 aktivitas selesaiMPSOverdue0/1744moPlan: Nov 10–Nov 14PROverdue0/1744moPlan: Nov 14–Nov 15SUMMARY KOMPONENOverdue0/1744moPlan: Nov 16–Nov 17MROverdue0/1744moPlan: Nov 15–Nov 16--44mo
PRODUCT & DEVELOPMENTProduct OnlyDeadline: Oct 12, 20220/4 aktivitas selesaiMPSOverdue0/645moPlan: Oct 7–Oct 28PROverdue0/645moPlan: Oct 10–Oct 31SUMMARY KOMPONENOverdue0/645moPlan: Oct 12–Nov 2MROverdue0/645moPlan: Oct 11–Nov 1--45mo
ELEC_ LV_SYSTEMProduct OnlyDeadline: Oct 27, 20220/4 aktivitas selesaiMPSOverdue0/145moPlan: Oct 31–Nov 2PROverdue0/145moPlan: Nov 2–Nov 3SUMMARY KOMPONENOverdue0/145moPlan: Nov 4–Nov 7MROverdue0/145moPlan: Nov 3–Nov 4--45mo
Forecast - Open Rack, Subrack, BB45UProduct OnlyDeadline: Sep 20, 20240/4 aktivitas selesaiMPSOverdue0/123moPlan: Aug 20–Aug 21PROverdue0/123moPlan: Aug 21–Aug 22SUMMARY KOMPONENOverdue0/123moPlan: Aug 23–Aug 23MROverdue0/123moPlan: Aug 22–Aug 23--23mo
Internal - Stock Rack Server Moratel & DCPDUProduct + InstalasiDeadline: Jan 30, 20262/6 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 11–Nov 11Actual: Nov 11Membuat PRDone1/1Plan: Nov 12–Nov 12Actual: Nov 12Membuat MROverdue0/18moPlan: Nov 21–Nov 24Membuat Summary KomponenOverdue0/18moPlan: Nov 21–Nov 21Membuat WO Produksi/ QC-QAOverdue0/18moPlan: Nov 24–Nov 24Report/Update MPSOverdue0/18moPlan: Nov 25–Nov 258mo
GSPE_STOK BOX PANEL MORATELProduct + InstalasiDeadline: Aug 13, 20250/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/310moPlan: Sep 4–Sep 5Membuat PROverdue0/310moPlan: Sep 5–Sep 8Membuat Summary KomponenOverdue0/310moPlan: Sep 8–Sep 9---10mo
Forecast_Stock Panel Hitachi IP42 & IP54Product + InstalasiDeadline: Oct 10, 20250/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/39moPlan: Oct 7–Oct 8Membuat PROverdue0/39moPlan: Oct 8–Oct 9Membuat Summary KomponenOverdue0/39moPlan: Oct 9–Oct 10---9mo
BDX - CGK1_RACK SERVER & rPDUProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue3/46moPlan: Dec 17–Jan 13Actual: Dec 20Membuat PROverdue3/46moPlan: Dec 18–Jan 14Actual: Dec 24Membuat Summary KomponenOverdue0/36moPlan: Dec 18–Jan 15---6mo
Internal - Layout Penambahan Unit Mesin HSGProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 13–Feb 13Membuat PROverdue0/15moPlan: Feb 13–Feb 16Membuat Summary KomponenOverdue0/15moPlan: Feb 16–Feb 17---5mo
Shimizu - Loadbank IRISProduct + InstalasiDeadline: Feb 22, 20263/6 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 18–Nov 24Actual: Nov 19Membuat PRDone1/1Plan: Nov 19–Nov 19Actual: Nov 19Membuat MRDone1/1Plan: Nov 19–Nov 20Actual: Nov 20Membuat Summary KomponenOverdue0/18moPlan: Nov 20–Nov 20Membuat WO Produksi/ QC-QAOverdue0/18moPlan: Nov 20–Nov 20Report/Update MPSOverdue0/18moPlan: Nov 23–Nov 238mo
PT Telin - Instalasi CLS PluitProduct + InstalasiDeadline: Feb 26, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Feb 27–Mar 2Membuat PROverdue0/14moPlan: Mar 2–Mar 3Membuat Summary KomponenOverdue0/14moPlan: Mar 3–Mar 4---4mo
Job LeaderProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue1/37moPlan: Nov 11–Dec 3Actual: Nov 11Membuat PROverdue0/26moPlan: Dec 3–Jan 21Membuat Summary KomponenOverdue0/17moPlan: Dec 4–Dec 5---7mo
Internal - Project ISO_27001Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 12–Feb 13Membuat PROverdue0/15moPlan: Feb 12–Feb 13Membuat Summary KomponenOverdue0/25moPlan: Feb 13–Feb 16---5mo
Internal - Program Estimator (Containment, Container, Smart Rack)Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 12–Feb 13Membuat PROverdue0/15moPlan: Feb 13–Feb 16Membuat Summary KomponenOverdue0/15moPlan: Feb 16–Feb 17---5mo
Internal - Automation Program CRM Section 1-4Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 12–Feb 13Membuat PROverdue0/15moPlan: Feb 13–Feb 16Membuat Summary KomponenOverdue0/15moPlan: Feb 16–Feb 17---5mo
Internal - 29 Line AssemblyProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/16moPlan: Dec 26–Dec 27Membuat PROverdue0/16moPlan: Dec 27–Dec 28Membuat Summary KomponenOverdue0/16moPlan: Dec 27–Dec 28---6mo
Internal - Perbaikan Loading/Unloading Area Pintu BelakangProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 12–Feb 12Membuat PROverdue0/15moPlan: Feb 12–Feb 13Membuat Summary KomponenOverdue0/15moPlan: Feb 13–Feb 16---5mo
Mega Akses - POP Tegal Cangkring-Bali (Add Battery)Product + InstalasiDeadline: Mar 13, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 6–Feb 9Membuat PROverdue0/15moPlan: Feb 9–Feb 10Membuat Summary KomponenOverdue0/15moPlan: Feb 10–Feb 11---5mo
Internal - Mini Data Center Rack (MDCR) from ScheneiderProduct + InstalasiDeadline: Mar 27, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/15moPlan: Feb 15–Feb 16Membuat PROverdue0/15moPlan: Feb 15–Feb 16Membuat Summary KomponenOverdue0/15moPlan: Feb 16–Feb 19---5mo
Mega Akses - Req.Battery - JABODETABEKProduct + InstalasiDeadline: Apr 10, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Feb 23–Feb 24Membuat PROverdue0/14moPlan: Feb 24–Feb 25Membuat Summary KomponenOverdue0/14moPlan: Feb 25–Feb 26---4mo
INTERNAL | - MDCC Trial Full Schneider Device - ContainerProduct + InstalasiDeadline: Apr 20, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue2/96moPlan: Jan 1–Jan 5Actual: Jan 5Membuat PROverdue0/96moPlan: Jan 5–Jan 20Membuat Summary KomponenOverdue0/96moPlan: Jan 6–Jan 20---6mo
Internal - Smart rPDUProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue1/45moPlan: Jan 19–Jan 26Actual: Jan 5Membuat PROverdue1/35moPlan: Jan 19–Jan 29Actual: Jan 29Membuat Summary KomponenOverdue0/26moPlan: Jan 20–Jan 23---6mo
Mega Akses - BDF Power Tanah Merah (Add Battery)Product + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Mar 6–Mar 9Membuat PROverdue0/14moPlan: Mar 9–Mar 10Membuat Summary KomponenOverdue0/14moPlan: Mar 10–Mar 11---4mo
Schneider Electric - LNGPPProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Mar 24–Mar 25Membuat PROverdue0/14moPlan: Mar 24–Mar 25Membuat Summary KomponenOverdue0/13moPlan: Mar 26–Mar 27---4mo
BDX - CGK1_Panel PDUProduct + InstalasiDeadline: May 21, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue1/26moPlan: Oct 31–Jan 9Actual: Dec 19Membuat PROverdue1/26moPlan: Nov 4–Jan 12Actual: Dec 24Membuat Summary KomponenOverdue0/26moPlan: Nov 5–Jan 13---6mo
Internal - Forecast Rack Server : (42U, 45U, 52U)Product + InstalasiDeadline: May 29, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue2/36moPlan: Dec 15–Jan 2Actual: Dec 31Membuat PROverdue0/54moPlan: Dec 18–Feb 25Membuat Summary KomponenOverdue0/44moPlan: Dec 18–Feb 25---6mo
Siemens - UCC BP TangguhProduct + InstalasiDeadline: May 29, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Mar 2–Mar 3Membuat PROverdue0/14moPlan: Mar 3–Mar 4Membuat Summary KomponenOverdue0/14moPlan: Mar 4–Mar 5---4mo
Intan Mufakat Raya - GIS 150 KV Gandul II/PamulangProduct + InstalasiDeadline: Jun 10, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Mar 17–Mar 18Membuat PROverdue0/14moPlan: Mar 18–Mar 19Membuat Summary KomponenOverdue0/14moPlan: Mar 19–Mar 20---4mo
Kelinci Mas Unggul - Panel MK Single PhiProduct + InstalasiDeadline: Jun 10, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12moPlan: May 13–May 14Membuat PROverdue0/12moPlan: May 14–May 15Membuat Summary KomponenOverdue0/12moPlan: May 15–May 18---2mo
Hitachi - ACP25035 - GI Satui 150kVProduct + InstalasiDeadline: Jun 19, 20263/6 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Jan 5–Jan 6Actual: Jan 5Membuat PRDone1/1Plan: Jan 6–Jan 6Actual: Jan 6Membuat MROverdue0/17moPlan: Dec 9–Dec 10Membuat Summary KomponenDone1/1Plan: Jan 7–Jan 8Actual: Jan 7Membuat WO Produksi/ QC-QAOverdue0/17moPlan: Dec 10–Dec 10Report/Update MPSOverdue0/17moPlan: Dec 11–Dec 117mo
Internal - MDCC 20 Feet POD Phase 2/IP65Product + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/18moPlan: Nov 10–Nov 11Membuat PROverdue0/14moPlan: Feb 23–Feb 24Membuat Summary KomponenOverdue0/14moPlan: Feb 23–Feb 24---8mo
Internal - Pembuatan Bak Treatment, Hoist, Oven dan TrolleyProduct + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue3/86moPlan: Nov 11–Jan 19Actual: Dec 15Membuat PROverdue1/105moPlan: Dec 8–Feb 2Actual: Feb 2Membuat Summary KomponenOverdue0/65moPlan: Dec 8–Jan 30---6mo
Wholesale - Panel DB - Dermaga BiakProduct + InstalasiDeadline: Jun 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/11moPlan: Jun 4–Jun 5Membuat PROverdue0/11moPlan: Jun 5–Jun 8Membuat Summary KomponenOverdue0/14wPlan: Jun 8–Jun 9---1mo
Hitachi - ACP25053 - DSS Maumere 150kVProduct + InstalasiDeadline: Jul 6, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Feb 25–Feb 25Membuat PROverdue0/14moPlan: Mar 5–Mar 5Membuat Summary KomponenOverdue0/13moPlan: Apr 3–Apr 3---4mo
Hitachi - ACP25085 - Sebuku PLN NPCProduct + InstalasiDeadline: Jul 6, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12moPlan: May 6–May 6Membuat PROverdue0/12moPlan: May 19–May 20Membuat Summary KomponenOverdue0/11moPlan: May 26–May 26---2mo
Hitachi - ACP25026 - BalonganProduct + InstalasiDeadline: Jul 20, 20263/6 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 28–Dec 1Actual: Nov 28Membuat PRDone1/1Plan: Dec 1–Dec 1Actual: Dec 1Membuat MROverdue0/18moPlan: Nov 3–Nov 4Membuat Summary KomponenDone1/1Plan: Dec 2–Dec 3Actual: Dec 2Membuat WO Produksi/ QC-QAOverdue0/18moPlan: Nov 4–Nov 4Report/Update MPSOverdue0/18moPlan: Nov 5–Nov 58mo
Inti Bumi Mas - Panel FeederProduct + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Mar 18–Mar 19Membuat PROverdue0/14moPlan: Mar 19–Mar 20Membuat Summary KomponenOverdue0/14moPlan: Mar 20–Mar 23---4mo
Hitachi - GI 150kV kruengProduct + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 24–Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 26Membuat Summary KomponenOverdue0/11wPlan: Jun 26–Jun 29---2w
ATOZ - Dakota Electrical Fitout (Batam)Product + InstalasiDeadline: Jul 24, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 22–Jun 23Membuat PROverdue0/12wPlan: Jun 23–Jun 24Membuat Summary KomponenOverdue0/12wPlan: Jun 24–Jun 25---2w
BDX CGK3 - Electrical MaterialProduct + InstalasiDeadline: Jul 24, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 24–Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 26Membuat Summary KomponenOverdue0/11wPlan: Jun 26–Jun 29---2w
DNA Teknologi Indonesia - Caging System DHIProduct + InstalasiDeadline: Jul 28, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/11wPlan: Jun 29–Jun 30Membuat PROverdue0/11wPlan: Jun 30–Jul 1Membuat Summary KomponenOverdue0/16dPlan: Jul 1–Jul 2---1w
Hitachi - ACP26018 - GI KM17 Borneo IndobaraProduct + InstalasiDeadline: Jul 30, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12moPlan: May 8–May 8Membuat PROverdue0/12moPlan: May 19–May 19Membuat Summary KomponenOverdue0/11moPlan: May 26–May 26---2mo
Mega Akes - HUB Majalengka (Add Battery)Product + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/14moPlan: Mar 5–Mar 6Membuat PROverdue0/14moPlan: Mar 6–Mar 9Membuat Summary KomponenOverdue0/14moPlan: Mar 9–Mar 10---4mo
Hitachi - ACP25099 - GI 150kV TakengonProduct + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 24–Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 26Membuat Summary KomponenOverdue0/11wPlan: Jun 26–Jun 29---2w
Hitachi - ACP25105 - Seko IndokomasProduct + InstalasiDeadline: Aug 12, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 24–Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 26Membuat Summary KomponenOverdue0/11wPlan: Jun 26–Jun 29---2w
Hitachi - GI 150kV SribawonoProduct + InstalasiDeadline: Aug 25, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 24–Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 26Membuat Summary KomponenOverdue0/11wPlan: Jun 26–Jun 29---2w
Hitachi - GI 150kV KolakaProduct + InstalasiDeadline: Aug 28, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/12wPlan: Jun 24–Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 26Membuat Summary KomponenOverdue0/11wPlan: Jun 26–Jun 29---2w
Demo/Mockup Panel Typetest Cubic, Eaton MV, Eaton LVProduct + InstalasiDeadline: Aug 31, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue1/55moPlan: Jan 19–Feb 13Actual: Feb 13Membuat PROverdue1/35moPlan: Jan 26–Feb 16Actual: Jan 30Membuat Summary KomponenOverdue0/45moPlan: Feb 13–Feb 16---5mo
INTERNAL-Ruang Meeting Smart RoomProduct OnlyDeadline: Sep 15, 20260/3 aktivitas selesaiEntry JOB & Report MPSOverdue0/13moPlan: Apr 20–Apr 21Membuat PROverdue0/13moPlan: Apr 21–Apr 22Membuat Summary KomponenOverdue0/13moPlan: Apr 21–Apr 22---3mo
PTT - Module MPTT DPC 3000 HE (25 unit)Product + InstalasiDeadline: Dec 19, 20251/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Dec 9–Dec 9Actual: Dec 9Membuat PROverdue0/16moPlan: Dec 31–Jan 1Membuat Summary KomponenOverdue0/16moPlan: Jan 1–Jan 2---6mo
Internal - Micro Data Centre EatonProduct + InstalasiDeadline: Jan 23, 20261/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Dec 30–Dec 31Actual: Dec 30Membuat PROverdue0/16moPlan: Dec 25–Dec 28Membuat Summary KomponenOverdue0/16moPlan: Dec 25–Dec 28---6mo
Review Product Presentation - Marketing UpdateProduct + InstalasiDeadline: Feb 27, 20261/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Jan 27–Jan 28Actual: Jan 27Membuat PROverdue0/15moPlan: Jan 27–Jan 28Membuat Summary KomponenOverdue0/25moPlan: Jan 28–Jan 31---5mo
PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - SentulProduct + InstalasiDeadline: Jun 1, 20261/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Mar 5–Mar 9Actual: Mar 6Membuat PROverdue0/14moPlan: Mar 13–Mar 17Membuat Summary KomponenOverdue0/14moPlan: Mar 13–Mar 18---4mo
Mega Akses Persada - BDF Power Papahan KaranganyarProduct + InstalasiDeadline: Aug 28, 20261/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Jun 25–Jun 25Actual: Jun 25Membuat PROverdue0/12wPlan: Jun 25–Jun 25Membuat Summary KomponenOverdue0/23dPlan: Jul 4–Jul 5---2w
Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KWProduct + InstalasiDeadline: Mar 31, 20262/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Dec 5–Dec 8Actual: Dec 8Membuat PRDone1/1Plan: Dec 8–Dec 9Actual: Dec 9Membuat Summary KomponenOverdue0/16moPlan: Dec 30–Dec 31---6mo
GSPE_Smart Rack (Micro Data Center)Product + InstalasiDeadline: Apr 6, 20262/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Jan 13–Jan 14Actual: Nov 13Membuat PRDone1/1Plan: Jan 14–Jan 15Actual: Nov 13Membuat Summary KomponenOverdue0/16moPlan: Jan 14–Jan 15---6mo
Schneider - Panel for PUSRI IIIB Project // E2010-96440Product + InstalasiDeadline: May 26, 20265/6 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 22–Nov 23Actual: Sep 4Membuat PRDone1/1Plan: Oct 30–Oct 30Actual: Oct 10Membuat MRDone1/1Plan: Sep 29–Sep 30Actual: Sep 30Membuat Summary KomponenOverdue0/14moPlan: Oct 31–Mar 21Membuat WO Produksi/ QC-QADone1/1Plan: Sep 30–Sep 30Actual: Sep 30Report/Update MPSDone1/1Plan: Oct 3–Oct 3Actual: Sep 184mo
Internal - Contaiment 50 UnitProduct + InstalasiDeadline: Jun 30, 20262/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 19–Nov 20Actual: Nov 20Membuat PRDone1/1Plan: Nov 20–Jan 26Actual: Dec 8Membuat Summary KomponenOverdue0/17moPlan: Dec 5–Dec 8---7mo
PT. NexWave_Panel TXDP & SDP AC_PO25090188Product + InstalasiDeadline: Jul 3, 20262/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Mar 19–Mar 20Actual: Mar 19Membuat PRDone1/1Plan: Mar 20–Mar 20Actual: Mar 20Membuat Summary KomponenOverdue0/14moPlan: Mar 19–Mar 20---4mo
Pembuatan Robot AGVProduct + InstalasiDeadline: Jul 24, 20262/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Jan 9–Jan 10Actual: Jan 9Membuat PRDone1/12dPlan: Jan 9–Jan 10Actual: Jan 12Membuat Summary KomponenOverdue0/37moPlan: Dec 16–Dec 17---7mo
Mega Akses - Omadata SurabayaProduct + InstalasiDeadline: Jul 31, 20262/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: May 15–May 18Actual: Apr 29Membuat PRDone1/1Plan: May 18–May 19Actual: Apr 30Membuat Summary KomponenOverdue0/12moPlan: May 18–May 19---2mo
PSN - Rack 20U UPS Hybrid + InverterProduct + InstalasiDeadline: Jun 3, 20262/2 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: May 13–May 13Actual: May 13Membuat PRDone1/1Plan: May 20–May 20Actual: May 20----
Hitachi - ACP25076 - Single Phi BarruProduct + InstalasiDeadline: Jun 16, 20263/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Feb 25–Feb 25Actual: Feb 25Membuat PRDone1/1Plan: Mar 5–Mar 5Actual: Mar 5Membuat Summary KomponenDone1/1Plan: Mar 31–Mar 31Actual: Mar 31---
MIG - PO-26-0171 - Project Alladin Panel S110 & S510 - Panel DistributionProduct + InstalasiDeadline: Jul 8, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 30–Jul 31Membuat PROn Progress0/1Plan: Jul 31–Aug 3Membuat Summary KomponenOn Progress0/1Plan: Aug 3–Aug 4---
Ekamas Mora Republik - POP Villa Beji Bali_ACPDB & DCPDBProduct + InstalasiDeadline: Jul 10, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 16–Jul 17Membuat PROn Progress0/1Plan: Jul 17–Jul 20Membuat Summary KomponenOn Progress0/1Plan: Jul 20–Jul 21---
Hitachi - ACP25029 - GI Tolinggula 150kVProduct + InstalasiDeadline: Jul 13, 20263/3 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Mar 25–Mar 25Actual: Mar 25Membuat PRDone1/1Plan: Apr 3–Apr 3Actual: Apr 3Membuat Summary KomponenDone1/1Plan: Apr 14–Apr 14Actual: Apr 14---
Inti Bumi Mas - Panel VFD 132KWProduct + InstalasiDeadline: Jul 22, 20262/2 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Dec 26–Dec 26Actual: Dec 26Membuat PRDone1/1Plan: Jan 8–Jan 8Actual: Jan 8----
PT. LTI_PO 26060314_ODC With Aircond 300W (1 Unit)Product + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 13–Jul 14Membuat PROn Progress0/1Plan: Jul 14–Jul 15Membuat Summary KomponenOn Progress0/1Plan: Jul 15–Jul 16---
Kelinci Mas - DSS TallolamaProduct OnlyDeadline: Aug 7, 20266/6 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 9–Nov 12Actual: Sep 23Membuat PRDone1/1Plan: Nov 12–Nov 12Actual: Nov 12Membuat MRDone1/1Plan: Nov 12–Nov 13Actual: Nov 13Membuat Summary KomponenDone1/1Plan: Nov 13–Nov 14Actual: Nov 14Membuat WO Produksi/ QC-QADone1/1Plan: Nov 13–Nov 13Actual: Nov 13Report/Update MPSDone1/1Plan: Nov 14–Nov 14Actual: Nov 14
Ekamas Mora Republik - Open Rack 42U & Rack DCPDU 3U_PO# 174372Product + InstalasiDeadline: Aug 7, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 8–Jul 9Membuat PROn Progress0/1Plan: Jul 9–Jul 10Membuat Summary KomponenOn Progress0/1Plan: Jul 10–Jul 13---
PT Roka Lane Asia - Rack Server 52U DWDM MMRProduct + InstalasiDeadline: Aug 21, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 14–Jul 15Membuat PROn Progress0/1Plan: Jul 15–Jul 16Membuat Summary KomponenOn Progress0/1Plan: Jul 16–Jul 17---
ERCS DCAM - Loadbank PanelProduct + InstalasiDeadline: Aug 24, 20262/2 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Jun 12–Jun 15Actual: May 22Membuat PRDone1/1Plan: Jun 15–May 21Actual: May 21----
Rumah Data Kita CGK11 - Rack Server 45UProduct + InstalasiDeadline: Sep 11, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 27–Jul 28Membuat PROn Progress0/1Plan: Jul 28–Jul 29Membuat Summary KomponenOn Progress0/1Plan: Jul 29–Jul 30---
Internal - Stock Box Container 40 Feet ( 10 Unit)Product + InstalasiDeadline: Sep 21, 20262/2 aktivitas selesaiEntry JOB & Report MPSDone1/1Plan: Nov 11–Dec 3Actual: Dec 3Membuat PRDone1/1Plan: Jan 5–Jan 12Actual: Jan 7----
Hitachi - ACP25111 - Muara Laboh Stage 2Product + InstalasiDeadline: Oct 23, 20260/3 aktivitas selesaiEntry JOB & Report MPSOn Progress0/1Plan: Jul 28–Jul 29Membuat PROn Progress0/1Plan: Jul 29–Jul 30Membuat Summary KomponenOn Progress0/1Plan: Jul 30–Jul 31---