| Internal - Stock Rack Server Moratel & DCPDUProduct + InstalasiDeadline: Jan 30, 20261/6 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/17moPlan: Nov 25–Nov 26 | Membuat PO SupplierDone1/1Plan: Nov 26–Nov 26Actual: Nov 26 | Preapare SubconOverdue0/38moPlan: Oct 27–Oct 27 | Update Report Jadwal Kedatangan BarangOverdue0/17moPlan: Nov 26–Nov 27 | Prepare ForwaderOverdue0/88moPlan: Oct 27–Oct 27 | Membuat Report Material Defect/ReturnOverdue0/17moPlan: Nov 27–Nov 27 | 8mo |
| Hitachi - ACP25026 - BalonganProduct + InstalasiDeadline: Jul 20, 20261/6 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/18moPlan: Nov 5–Nov 6 | Membuat PO SupplierDone1/112moPlan: Dec 4–Dec 4Actual: Dec 4 | Preapare SubconOverdue0/17moPlan: Dec 4–Dec 4 | Update Report Jadwal Kedatangan BarangOverdue0/18moPlan: Nov 6–Nov 7 | Prepare ForwaderOverdue0/17moPlan: Dec 4–Dec 4 | Membuat Report Material Defect/ReturnOverdue0/18moPlan: Nov 6–Nov 7 | 12mo |
| Shimizu - Loadbank IRISProduct + InstalasiDeadline: Feb 22, 20260/4 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/18moPlan: Nov 23–Nov 24 | Membuat PO SupplierOverdue0/18moPlan: Nov 24–Nov 24 | Update Report Jadwal Kedatangan BarangOverdue0/18moPlan: Nov 24–Nov 25 | Membuat Report Material Defect/ReturnOverdue0/18moPlan: Nov 25–Nov 25 | - | - | 8mo |
| ENGINEERING OPRASIONAL 2022Product OnlyDeadline: Jun 9, 20220/3 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/749moPlan: Jun 17–Jun 20 | Membuat PO SupplierOverdue0/749moPlan: Jun 20–Jun 22 | Update Report Jadwal Kedatangan BarangOverdue0/749moPlan: Jun 22–Jun 23 | - | - | - | 49mo |
| MECHANICAL PROSESProduct OnlyDeadline: Oct 12, 20220/3 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/2943moPlan: Oct 24–Dec 12 | Membuat PO SupplierOverdue0/2943moPlan: Oct 25–Dec 14 | Update Report Jadwal Kedatangan BarangOverdue0/2943moPlan: Oct 25–Dec 15 | - | - | - | 43mo |
| PRODUCT & DEVELOPMENTProduct OnlyDeadline: Oct 12, 20220/3 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/544moPlan: Oct 20–Nov 25 | Membuat PO SupplierOverdue0/544moPlan: Oct 24–Nov 28 | Update Report Jadwal Kedatangan BarangOverdue0/544moPlan: Oct 26–Nov 29 | - | - | - | 44mo |
| ELEC_ LV_SYSTEMProduct OnlyDeadline: Oct 27, 20220/3 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/144moPlan: Nov 28–Nov 30 | Membuat PO SupplierOverdue0/144moPlan: Nov 30–Dec 2 | Update Report Jadwal Kedatangan BarangOverdue0/144moPlan: Dec 2–Dec 5 | - | - | - | 44mo |
| Forecast - Open Rack, Subrack, BB45UProduct OnlyDeadline: Sep 20, 20240/3 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/122moPlan: Aug 30–Sep 2 | Membuat PO SupplierOverdue0/122moPlan: Sep 2–Sep 4 | Update Report Jadwal Kedatangan BarangOverdue0/122moPlan: Sep 4–Sep 5 | - | - | - | 22mo |
| GSPE_STOK BOX PANEL MORATELProduct + InstalasiDeadline: Aug 13, 20250/3 aktivitas selesai | Membuat PO SupplierOverdue1/310moPlan: Sep 9–Sep 10Actual: Sep 10 | Preapare SubconOverdue0/810moPlan: Sep 9–Sep 11 | Prepare ForwaderOverdue0/510moPlan: Sep 10–Sep 11 | - | - | - | 10mo |
| Forecast_Stock Panel Hitachi IP42 & IP54Product + InstalasiDeadline: Oct 10, 20250/3 aktivitas selesai | Membuat PO SupplierOverdue0/39moPlan: Oct 10–Oct 13 | Preapare SubconOverdue0/39moPlan: Oct 13–Oct 14 | Prepare ForwaderOverdue0/39moPlan: Oct 14–Oct 14 | - | - | - | 9mo |
| PTT - Module MPTT DPC 3000 HE (25 unit)Product + InstalasiDeadline: Dec 19, 20250/3 aktivitas selesai | Membuat PO SupplierOverdue0/16moPlan: Jan 2–Jan 5 | Preapare SubconOverdue0/16moPlan: Jan 5–Jan 6 | Prepare ForwaderOverdue0/16moPlan: Jan 6–Jan 7 | - | - | - | 6mo |
| BDX - CGK1_RACK SERVER & rPDUProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue3/46moPlan: Dec 20–Jan 16Actual: Jan 9 | Preapare SubconOverdue0/35moPlan: Dec 22–Jan 29 | Prepare ForwaderOverdue0/35moPlan: Jan 19–Jan 27 | - | - | - | 6mo |
| Internal - Layout Penambahan Unit Mesin HSGProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/15moPlan: Feb 17–Feb 18 | Preapare SubconOverdue0/15moPlan: Feb 18–Feb 19 | Prepare ForwaderOverdue0/15moPlan: Feb 19–Feb 20 | - | - | - | 5mo |
| PT Telin - Instalasi CLS PluitProduct + InstalasiDeadline: Feb 26, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/14moPlan: Mar 4–Mar 5 | Preapare SubconOverdue0/14moPlan: Mar 5–Mar 6 | Prepare ForwaderOverdue0/14moPlan: Mar 6–Mar 6 | - | - | - | 4mo |
| Job LeaderProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/26moPlan: Dec 5–Jan 21 | Preapare SubconOverdue0/17moPlan: Dec 8–Dec 9 | Prepare ForwaderOverdue0/17moPlan: Dec 9–Dec 9 | - | - | - | 7mo |
| Internal - Project ISO_27001Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/15moPlan: Feb 16–Feb 17 | Preapare SubconOverdue0/15moPlan: Feb 17–Feb 18 | Prepare ForwaderOverdue0/45moPlan: Feb 18–Feb 19 | - | - | - | 5mo |
| Internal - Program Estimator (Containment, Container, Smart Rack)Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/15moPlan: Feb 16–Feb 17 | Preapare SubconOverdue0/15moPlan: Feb 17–Feb 18 | Prepare ForwaderOverdue0/15moPlan: Feb 18–Feb 19 | - | - | - | 5mo |
| Internal - Automation Program CRM Section 1-4Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/15moPlan: Feb 16–Feb 17 | Preapare SubconOverdue0/15moPlan: Feb 17–Feb 18 | Prepare ForwaderOverdue0/15moPlan: Feb 18–Feb 19 | - | - | - | 5mo |
| Review Product Presentation - Marketing UpdateProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/15moPlan: Jan 31–Feb 1 | Preapare SubconOverdue0/25moPlan: Feb 1–Feb 2 | Prepare ForwaderOverdue0/15moPlan: Feb 2–Feb 3 | - | - | - | 5mo |
| Mega Akses - POP Tegal Cangkring-Bali (Add Battery)Product + InstalasiDeadline: Mar 13, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/15moPlan: Feb 11–Feb 12 | Preapare SubconOverdue0/15moPlan: Feb 12–Feb 13 | Prepare ForwaderOverdue0/15moPlan: Feb 13–Feb 13 | - | - | - | 5mo |
| GSPE_Smart Rack (Micro Data Center)Product + InstalasiDeadline: Apr 6, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue1/26moPlan: Sep 16–Jan 19Actual: Nov 19 | Preapare SubconOverdue0/16moPlan: Jan 16–Jan 19 | Prepare ForwaderOverdue0/16moPlan: Jan 19–Jan 20 | - | - | - | 6mo |
| Mega Akses - Req.Battery - JABODETABEKProduct + InstalasiDeadline: Apr 10, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/14moPlan: Feb 26–Feb 27 | Preapare SubconOverdue0/14moPlan: Feb 27–Mar 2 | Prepare ForwaderOverdue0/14moPlan: Mar 2–Mar 2 | - | - | - | 4mo |
| INTERNAL | - MDCC Trial Full Schneider Device - ContainerProduct + InstalasiDeadline: Apr 20, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue8/96moPlan: Jan 6–Jan 8Actual: Jan 8 | Preapare SubconOverdue0/136moPlan: Jan 6–Jan 9 | Prepare ForwaderOverdue0/116moPlan: Jan 8–Jan 17 | - | - | - | 6mo |
| Internal - Smart rPDUProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/16moPlan: Jan 23–Jan 24 | Preapare SubconOverdue0/15moPlan: Jan 24–Jan 25 | Prepare ForwaderOverdue0/15moPlan: Jan 25–Jan 26 | - | - | - | 6mo |
| Mega Akses - BDF Power Tanah Merah (Add Battery)Product + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/14moPlan: Mar 11–Mar 12 | Preapare SubconOverdue0/14moPlan: Mar 12–Mar 13 | Prepare ForwaderOverdue0/14moPlan: Mar 13–Mar 13 | - | - | - | 4mo |
| Schneider Electric - LNGPPProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/13moPlan: Mar 26–Mar 27 | Preapare SubconOverdue0/13moPlan: Mar 27–Mar 30 | Prepare ForwaderOverdue0/13moPlan: Mar 30–Mar 31 | - | - | - | 3mo |
| BDX - CGK1_Panel PDUProduct + InstalasiDeadline: May 21, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue1/26moPlan: Nov 9–Jan 14Actual: Jan 9 | Preapare SubconOverdue0/26moPlan: Nov 9–Jan 15 | Prepare ForwaderOverdue1/36moPlan: Dec 12–Jan 16Actual: Dec 12 | - | - | - | 6mo |
| Intan Mufakat Raya - GIS 150 KV Gandul II/PamulangProduct + InstalasiDeadline: Jun 10, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/14moPlan: Mar 20–Mar 23 | Preapare SubconOverdue0/14moPlan: Mar 23–Mar 24 | Prepare ForwaderOverdue0/14moPlan: Mar 24–Mar 24 | - | - | - | 4mo |
| Hitachi - ACP25035 - GI Satui 150kVProduct + InstalasiDeadline: Jun 19, 20261/4 aktivitas selesai | Membuat Inquiry Ke SupplierOverdue0/17moPlan: Dec 11–Dec 12 | Membuat PO SupplierDone1/1Plan: Jan 9–Jan 9Actual: Jan 9 | Update Report Jadwal Kedatangan BarangOverdue0/17moPlan: Dec 12–Dec 15 | Membuat Report Material Defect/ReturnOverdue0/27moPlan: Dec 12–Dec 15 | - | - | 7mo |
| Mega Akes - HUB Majalengka (Add Battery)Product + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesai | Membuat PO SupplierOverdue0/14moPlan: Mar 10–Mar 11 | Preapare SubconOverdue0/14moPlan: Mar 11–Mar 12 | Prepare ForwaderOverdue0/14moPlan: Mar 12–Mar 12 | - | - | - | 4mo |
| Internal - Micro Data Centre EatonProduct + InstalasiDeadline: Jan 23, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jan 6–Jan 7Actual: Jan 7 | Preapare SubconOverdue0/16moPlan: Jan 6–Jan 7 | Prepare ForwaderOverdue0/16moPlan: Jan 7–Jan 8 | - | - | - | 6mo |
| Internal - Perbaikan Loading/Unloading Area Pintu BelakangProduct + InstalasiDeadline: Feb 27, 20261/3 aktivitas selesai | Membuat PO SupplierOverdue1/65moPlan: Feb 16–Feb 18Actual: Feb 18 | Preapare SubconDone1/1Plan: Feb 25–Apr 3Actual: Mar 30 | Prepare ForwaderOverdue0/13moPlan: Mar 26–Mar 27 | - | - | - | 5mo |
| Internal - Forecast Rack Server : (42U, 45U, 52U)Product + InstalasiDeadline: May 29, 20261/3 aktivitas selesai | Membuat PO SupplierDone3/3Plan: Feb 3–Feb 27Actual: Feb 27 | Preapare SubconOverdue0/34moPlan: Feb 3–Feb 27 | Prepare ForwaderOverdue0/34moPlan: Feb 4–Feb 28 | - | - | - | 4mo |
| Internal - MDCC 20 Feet POD Phase 2/IP65Product + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Feb 27–Feb 28Actual: Feb 27 | Preapare SubconOverdue0/14moPlan: Feb 27–Feb 28 | Prepare ForwaderOverdue0/14moPlan: Feb 28–Mar 1 | - | - | - | 4mo |
| Internal - Contaiment 50 UnitProduct + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Dec 9–Jan 27Actual: Dec 10 | Preapare SubconOverdue0/17moPlan: Dec 9–Dec 10 | Prepare ForwaderOverdue0/17moPlan: Dec 10–Dec 11 | - | - | - | 7mo |
| Internal - Pembuatan Bak Treatment, Hoist, Oven dan TrolleyProduct + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesai | Membuat PO SupplierDone4/4Plan: Nov 28–Feb 1Actual: Jan 30 | Preapare SubconOverdue3/55moPlan: Dec 11–Feb 2Actual: Feb 2 | Prepare ForwaderOverdue0/35moPlan: Dec 11–Feb 2 | - | - | - | 5mo |
| Wholesale - Panel DB - Dermaga BiakProduct + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/14wPlan: Jun 9–Jun 10Actual: Jul 7 | Preapare SubconOverdue0/14wPlan: Jun 10–Jun 11 | Prepare ForwaderOverdue0/14wPlan: Jun 11–Jun 11 | - | - | - | 4w |
| PT. NexWave_Panel TXDP & SDP AC_PO25090188Product + InstalasiDeadline: Jul 3, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Mar 23–Mar 24Actual: Mar 23 | Preapare SubconOverdue0/14moPlan: Mar 23–Mar 24 | Prepare ForwaderOverdue0/24moPlan: Mar 24–Mar 25 | - | - | - | 4mo |
| Hitachi - ACP25085 - Sebuku PLN NPCProduct + InstalasiDeadline: Jul 6, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: May 21–May 22Actual: May 22 | Preapare SubconOverdue0/11moPlan: Jun 4–Jun 5 | Prepare ForwaderOverdue0/21moPlan: Jun 5–Jun 8 | - | - | - | 1mo |
| Hitachi - GI 150kV kruengProduct + InstalasiDeadline: Jul 22, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29 | Preapare SubconOverdue0/11wPlan: Jun 29–Jun 30 | Prepare ForwaderOverdue0/21wPlan: Jun 30–Jul 1 | - | - | - | 1w |
| Pembuatan Robot AGVProduct + InstalasiDeadline: Jul 24, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jan 12–Jan 13Actual: Jan 13 | Preapare SubconOverdue0/16moPlan: Jan 12–Jan 13 | Prepare ForwaderOverdue0/16moPlan: Jan 13–Jan 16 | - | - | - | 6mo |
| BDX CGK3 - Electrical MaterialProduct + InstalasiDeadline: Jul 24, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 12 | Preapare SubconOverdue0/11wPlan: Jun 30–Jul 1 | Prepare ForwaderOverdue0/11wPlan: Jul 1–Jul 1 | - | - | - | 1w |
| DNA Teknologi Indonesia - Caging System DHIProduct + InstalasiDeadline: Jul 28, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jul 2–Jul 3Actual: Jul 2 | Preapare SubconOverdue0/12dPlan: Jul 3–Jul 6 | Prepare ForwaderOverdue0/12dPlan: Jul 6–Jul 6 | - | - | - | 2d |
| Hitachi - ACP25099 - GI 150kV TakengonProduct + InstalasiDeadline: Jul 31, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29 | Preapare SubconOverdue0/21wPlan: Jun 29–Jun 30 | Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1 | - | - | - | 1w |
| Kelinci Mas - DSS TallolamaProduct OnlyDeadline: Aug 7, 20264/6 aktivitas selesai | Membuat Inquiry Ke SupplierDone1/12dPlan: Nov 14–Nov 15Actual: Nov 17 | Membuat PO SupplierDone1/12dPlan: Nov 15–Nov 15Actual: Nov 17 | Preapare SubconOverdue0/18moPlan: Nov 15–Nov 15 | Update Report Jadwal Kedatangan BarangDone1/11dPlan: Nov 15–Nov 16Actual: Nov 17 | Prepare ForwaderOverdue0/18moPlan: Nov 15–Nov 15 | Membuat Report Material Defect/ReturnDone1/12dPlan: Nov 16–Nov 16Actual: Nov 18 | 8mo |
| Hitachi - ACP25105 - Seko IndokomasProduct + InstalasiDeadline: Aug 12, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 4 | Preapare SubconOverdue0/11wPlan: Jun 29–Jun 30 | Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1 | - | - | - | 1w |
| Hitachi - GI 150kV SribawonoProduct + InstalasiDeadline: Aug 25, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29 | Preapare SubconOverdue0/11wPlan: Jun 29–Jun 30 | Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1 | - | - | - | 1w |
| Hitachi - GI 150kV KolakaProduct + InstalasiDeadline: Aug 28, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29 | Preapare SubconOverdue0/21wPlan: Jun 29–Jun 30 | Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1 | - | - | - | 1w |
| Demo/Mockup Panel Typetest Cubic, Eaton MV, Eaton LVProduct + InstalasiDeadline: Aug 31, 20261/3 aktivitas selesai | Membuat PO SupplierDone3/3Plan: Feb 3–Mar 20Actual: Mar 16 | Preapare SubconOverdue0/35moPlan: Feb 17–Feb 18 | Prepare ForwaderOverdue0/35moPlan: Feb 18–Feb 19 | - | - | - | 5mo |
| INTERNAL-Ruang Meeting Smart RoomProduct OnlyDeadline: Sep 15, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/13dPlan: Apr 23–Apr 24Actual: Apr 27 | Preapare SubconOverdue0/23moPlan: Apr 23–Apr 24 | Prepare ForwaderOverdue0/12moPlan: Apr 24–Apr 27 | - | - | - | 3mo |
| Internal - 29 Line AssemblyProduct + InstalasiDeadline: Feb 27, 20262/3 aktivitas selesai | Membuat PO SupplierDone1/112moPlan: Dec 31–Jan 1Actual: Dec 30 | Preapare SubconDone1/11moPlan: Jan 1–Jan 2Actual: Feb 2 | Prepare ForwaderOverdue0/16moPlan: Jan 1–Jan 2 | - | - | - | 12mo |
| Internal - Mini Data Center Rack (MDCR) from ScheneiderProduct + InstalasiDeadline: Mar 27, 20262/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Feb 20–Feb 21Actual: Feb 20 | Preapare SubconDone1/1Plan: Feb 21–Feb 22Actual: Feb 22 | Prepare ForwaderOverdue0/15moPlan: Feb 21–Feb 22 | - | - | - | 5mo |
| Schneider - Panel for PUSRI IIIB Project // E2010-96440Product + InstalasiDeadline: May 26, 20263/4 aktivitas selesai | Membuat Inquiry Ke SupplierDone1/1Plan: Oct 3–Oct 3Actual: Oct 3 | Membuat PO SupplierDone1/1Plan: Nov 6–Nov 6Actual: Oct 6 | Update Report Jadwal Kedatangan BarangDone1/1Plan: Oct 6–Oct 6Actual: Oct 6 | Membuat Report Material Defect/ReturnOverdue0/19moPlan: Oct 6–Oct 6 | - | - | 9mo |
| Siemens - UCC BP TangguhProduct + InstalasiDeadline: May 29, 20262/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Mar 5–Mar 6Actual: Mar 6 | Preapare SubconDone1/1Plan: Mar 6–Mar 9Actual: Mar 9 | Prepare ForwaderOverdue0/24moPlan: Mar 6–Mar 9 | - | - | - | 4mo |
| Moratel - Baterry Enersys 100 Ah PO 165347 - (300 Blok)Product OnlyDeadline: Aug 28, 20251/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Apr 7–Apr 7Actual: Apr 7 | - | - | - | - | - | — |
| Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KWProduct + InstalasiDeadline: Mar 31, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Dec 10–Dec 15Actual: Dec 15 | - | - | - | - | - | — |
| PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - SentulProduct + InstalasiDeadline: Jun 1, 20262/2 aktivitas selesai | Membuat PO SupplierDone1/12moPlan: Mar 18–Mar 25Actual: May 25 | Preapare SubconDone1/13moPlan: Mar 11–Mar 18Actual: Jun 19 | - | - | - | - | 3mo |
| PSN - Rack 20U UPS Hybrid + InverterProduct + InstalasiDeadline: Jun 3, 20261/2 aktivitas selesai | Membuat PO SupplierDone1/11dPlan: May 20–May 20Actual: May 21 | Prepare ForwaderOn Progress0/1Plan: Jul 20–Jul 27 | - | - | - | - | 1d |
| Kelinci Mas Unggul - Panel MK Single PhiProduct + InstalasiDeadline: Jun 10, 20263/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: May 18–May 19Actual: May 19 | Preapare SubconDone1/1Plan: May 19–May 20Actual: May 19 | Prepare ForwaderDone1/1Plan: May 20–May 20Actual: May 20 | - | - | - | — |
| Hitachi - ACP25076 - Single Phi BarruProduct + InstalasiDeadline: Jun 16, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Mar 9–Mar 10Actual: Mar 10 | - | - | - | - | - | — |
| Hitachi - ACP25053 - DSS Maumere 150kVProduct + InstalasiDeadline: Jul 6, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Mar 9–Mar 9Actual: Feb 26 | - | - | - | - | - | — |
| MIG - PO-26-0171 - Project Alladin Panel S110 & S510 - Panel DistributionProduct + InstalasiDeadline: Jul 8, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Aug 4–Aug 5 | Preapare SubconOn Progress0/1Plan: Aug 5–Aug 6 | Prepare ForwaderOn Progress0/1Plan: Aug 6–Aug 6 | - | - | - | — |
| Ekamas Mora Republik - POP Villa Beji Bali_ACPDB & DCPDBProduct + InstalasiDeadline: Jul 10, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Jul 21–Jul 22 | Preapare SubconOn Progress0/1Plan: Jul 22–Jul 23 | Prepare ForwaderOn Progress0/1Plan: Jul 23–Jul 23 | - | - | - | — |
| Hitachi - ACP25029 - GI Tolinggula 150kVProduct + InstalasiDeadline: Jul 13, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Apr 6–Apr 6Actual: Apr 6 | - | - | - | - | - | — |
| Inti Bumi Mas - Panel VFD 132KWProduct + InstalasiDeadline: Jul 22, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jan 12–Jan 13Actual: Jan 12 | - | - | - | - | - | — |
| Inti Bumi Mas - Panel FeederProduct + InstalasiDeadline: Jul 22, 20263/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Mar 23–Mar 24Actual: Mar 24 | Preapare SubconDone1/1Plan: Mar 24–Mar 25Actual: Mar 25 | Prepare ForwaderDone1/1Plan: Mar 25–Mar 25Actual: Mar 25 | - | - | - | — |
| PT. LTI_PO 26060314_ODC With Aircond 300W (1 Unit)Product + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Jul 16–Jul 17 | Preapare SubconOn Progress0/1Plan: Jul 17–Jul 20 | Prepare ForwaderOn Progress0/1Plan: Jul 20–Jul 20 | - | - | - | — |
| ATOZ - Dakota Electrical Fitout (Batam)Product + InstalasiDeadline: Jul 24, 20263/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 25–Jun 26Actual: May 21 | Preapare SubconDone1/1Plan: Jun 26–Jun 29Actual: Jun 26 | Prepare ForwaderDone1/1Plan: Jun 29–Jun 29Actual: Jun 26 | - | - | - | — |
| Hitachi - ACP26018 - GI KM17 Borneo IndobaraProduct + InstalasiDeadline: Jul 30, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/1Plan: May 20–May 20Actual: May 20 | - | - | - | - | - | — |
| Mega Akses - Omadata SurabayaProduct + InstalasiDeadline: Jul 31, 20263/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: May 20–May 21Actual: May 4 | Preapare SubconDone1/1Plan: May 21–May 22Actual: May 6 | Prepare ForwaderDone1/1Plan: May 22–May 22Actual: May 7 | - | - | - | — |
| Ekamas Mora Republik - Open Rack 42U & Rack DCPDU 3U_PO# 174372Product + InstalasiDeadline: Aug 7, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Jul 13–Jul 14 | Preapare SubconOn Progress0/1Plan: Jul 14–Jul 15 | Prepare ForwaderOn Progress0/1Plan: Jul 15–Jul 15 | - | - | - | — |
| PT Roka Lane Asia - Rack Server 52U DWDM MMRProduct + InstalasiDeadline: Aug 21, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jul 17–Jul 20Actual: Jul 6 | Preapare SubconOn Progress0/1Plan: Jul 20–Jul 21 | Prepare ForwaderOn Progress0/1Plan: Jul 21–Jul 21 | - | - | - | — |
| ERCS DCAM - Loadbank PanelProduct + InstalasiDeadline: Aug 24, 20261/3 aktivitas selesai | Membuat PO SupplierDone1/1Plan: Jun 17–Jun 18Actual: Jun 18 | Preapare SubconOn Progress0/1Plan: Jul 1–Jul 10 | Prepare ForwaderOn Progress0/1Plan: Jul 13–Jul 17 | - | - | - | — |
| Mega Akses Persada - BDF Power Papahan KaranganyarProduct + InstalasiDeadline: Aug 28, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Jul 5–Jul 8 | Preapare SubconOn Progress0/3Plan: Jul 8–Jul 9 | Prepare ForwaderOn Progress0/1Plan: Jul 9–Jul 10 | - | - | - | — |
| Rumah Data Kita CGK11 - Rack Server 45UProduct + InstalasiDeadline: Sep 11, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Jul 30–Jul 31 | Preapare SubconOn Progress0/1Plan: Jul 31–Aug 3 | Prepare ForwaderOn Progress0/1Plan: Aug 3–Aug 3 | - | - | - | — |
| Internal - Stock Box Container 40 Feet ( 10 Unit)Product + InstalasiDeadline: Sep 21, 20261/1 aktivitas selesai | Membuat PO SupplierDone1/12wPlan: Jan 6–Jan 15Actual: Jan 26 | - | - | - | - | - | 2w |
| Hitachi - ACP25111 - Muara Laboh Stage 2Product + InstalasiDeadline: Oct 23, 20260/3 aktivitas selesai | Membuat PO SupplierOn Progress0/1Plan: Jul 31–Aug 3 | Preapare SubconOn Progress0/1Plan: Aug 3–Aug 4 | Prepare ForwaderOn Progress0/1Plan: Aug 4–Aug 4 | - | - | - | — |