Tugas — Purchasing

Purchasing · 77 job · 139 telat

Purchasing PUR

Done On progress Overdue Outstanding
77 job · 225 aktivitas · 139 telat
Nama ProjectAktivitas 1Aktivitas 2Aktivitas 3Aktivitas 4Aktivitas 5Aktivitas 6Highest Delay
Internal - Stock Rack Server Moratel & DCPDUProduct + InstalasiDeadline: Jan 30, 20261/6 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/17moPlan: Nov 25–Nov 26Membuat PO SupplierDone1/1Plan: Nov 26–Nov 26Actual: Nov 26Preapare SubconOverdue0/38moPlan: Oct 27–Oct 27Update Report Jadwal Kedatangan BarangOverdue0/17moPlan: Nov 26–Nov 27Prepare ForwaderOverdue0/88moPlan: Oct 27–Oct 27Membuat Report Material Defect/ReturnOverdue0/17moPlan: Nov 27–Nov 278mo
Hitachi - ACP25026 - BalonganProduct + InstalasiDeadline: Jul 20, 20261/6 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/18moPlan: Nov 5–Nov 6Membuat PO SupplierDone1/112moPlan: Dec 4–Dec 4Actual: Dec 4Preapare SubconOverdue0/17moPlan: Dec 4–Dec 4Update Report Jadwal Kedatangan BarangOverdue0/18moPlan: Nov 6–Nov 7Prepare ForwaderOverdue0/17moPlan: Dec 4–Dec 4Membuat Report Material Defect/ReturnOverdue0/18moPlan: Nov 6–Nov 712mo
Shimizu - Loadbank IRISProduct + InstalasiDeadline: Feb 22, 20260/4 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/18moPlan: Nov 23–Nov 24Membuat PO SupplierOverdue0/18moPlan: Nov 24–Nov 24Update Report Jadwal Kedatangan BarangOverdue0/18moPlan: Nov 24–Nov 25Membuat Report Material Defect/ReturnOverdue0/18moPlan: Nov 25–Nov 25--8mo
ENGINEERING OPRASIONAL 2022Product OnlyDeadline: Jun 9, 20220/3 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/749moPlan: Jun 17–Jun 20Membuat PO SupplierOverdue0/749moPlan: Jun 20–Jun 22Update Report Jadwal Kedatangan BarangOverdue0/749moPlan: Jun 22–Jun 23---49mo
MECHANICAL PROSESProduct OnlyDeadline: Oct 12, 20220/3 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/2943moPlan: Oct 24–Dec 12Membuat PO SupplierOverdue0/2943moPlan: Oct 25–Dec 14Update Report Jadwal Kedatangan BarangOverdue0/2943moPlan: Oct 25–Dec 15---43mo
PRODUCT & DEVELOPMENTProduct OnlyDeadline: Oct 12, 20220/3 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/544moPlan: Oct 20–Nov 25Membuat PO SupplierOverdue0/544moPlan: Oct 24–Nov 28Update Report Jadwal Kedatangan BarangOverdue0/544moPlan: Oct 26–Nov 29---44mo
ELEC_ LV_SYSTEMProduct OnlyDeadline: Oct 27, 20220/3 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/144moPlan: Nov 28–Nov 30Membuat PO SupplierOverdue0/144moPlan: Nov 30–Dec 2Update Report Jadwal Kedatangan BarangOverdue0/144moPlan: Dec 2–Dec 5---44mo
Forecast - Open Rack, Subrack, BB45UProduct OnlyDeadline: Sep 20, 20240/3 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/122moPlan: Aug 30–Sep 2Membuat PO SupplierOverdue0/122moPlan: Sep 2–Sep 4Update Report Jadwal Kedatangan BarangOverdue0/122moPlan: Sep 4–Sep 5---22mo
GSPE_STOK BOX PANEL MORATELProduct + InstalasiDeadline: Aug 13, 20250/3 aktivitas selesaiMembuat PO SupplierOverdue1/310moPlan: Sep 9–Sep 10Actual: Sep 10Preapare SubconOverdue0/810moPlan: Sep 9–Sep 11Prepare ForwaderOverdue0/510moPlan: Sep 10–Sep 11---10mo
Forecast_Stock Panel Hitachi IP42 & IP54Product + InstalasiDeadline: Oct 10, 20250/3 aktivitas selesaiMembuat PO SupplierOverdue0/39moPlan: Oct 10–Oct 13Preapare SubconOverdue0/39moPlan: Oct 13–Oct 14Prepare ForwaderOverdue0/39moPlan: Oct 14–Oct 14---9mo
PTT - Module MPTT DPC 3000 HE (25 unit)Product + InstalasiDeadline: Dec 19, 20250/3 aktivitas selesaiMembuat PO SupplierOverdue0/16moPlan: Jan 2–Jan 5Preapare SubconOverdue0/16moPlan: Jan 5–Jan 6Prepare ForwaderOverdue0/16moPlan: Jan 6–Jan 7---6mo
BDX - CGK1_RACK SERVER & rPDUProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue3/46moPlan: Dec 20–Jan 16Actual: Jan 9Preapare SubconOverdue0/35moPlan: Dec 22–Jan 29Prepare ForwaderOverdue0/35moPlan: Jan 19–Jan 27---6mo
Internal - Layout Penambahan Unit Mesin HSGProduct + InstalasiDeadline: Feb 6, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/15moPlan: Feb 17–Feb 18Preapare SubconOverdue0/15moPlan: Feb 18–Feb 19Prepare ForwaderOverdue0/15moPlan: Feb 19–Feb 20---5mo
PT Telin - Instalasi CLS PluitProduct + InstalasiDeadline: Feb 26, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/14moPlan: Mar 4–Mar 5Preapare SubconOverdue0/14moPlan: Mar 5–Mar 6Prepare ForwaderOverdue0/14moPlan: Mar 6–Mar 6---4mo
Job LeaderProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/26moPlan: Dec 5–Jan 21Preapare SubconOverdue0/17moPlan: Dec 8–Dec 9Prepare ForwaderOverdue0/17moPlan: Dec 9–Dec 9---7mo
Internal - Project ISO_27001Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/15moPlan: Feb 16–Feb 17Preapare SubconOverdue0/15moPlan: Feb 17–Feb 18Prepare ForwaderOverdue0/45moPlan: Feb 18–Feb 19---5mo
Internal - Program Estimator (Containment, Container, Smart Rack)Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/15moPlan: Feb 16–Feb 17Preapare SubconOverdue0/15moPlan: Feb 17–Feb 18Prepare ForwaderOverdue0/15moPlan: Feb 18–Feb 19---5mo
Internal - Automation Program CRM Section 1-4Product + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/15moPlan: Feb 16–Feb 17Preapare SubconOverdue0/15moPlan: Feb 17–Feb 18Prepare ForwaderOverdue0/15moPlan: Feb 18–Feb 19---5mo
Review Product Presentation - Marketing UpdateProduct + InstalasiDeadline: Feb 27, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/15moPlan: Jan 31–Feb 1Preapare SubconOverdue0/25moPlan: Feb 1–Feb 2Prepare ForwaderOverdue0/15moPlan: Feb 2–Feb 3---5mo
Mega Akses - POP Tegal Cangkring-Bali (Add Battery)Product + InstalasiDeadline: Mar 13, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/15moPlan: Feb 11–Feb 12Preapare SubconOverdue0/15moPlan: Feb 12–Feb 13Prepare ForwaderOverdue0/15moPlan: Feb 13–Feb 13---5mo
GSPE_Smart Rack (Micro Data Center)Product + InstalasiDeadline: Apr 6, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue1/26moPlan: Sep 16–Jan 19Actual: Nov 19Preapare SubconOverdue0/16moPlan: Jan 16–Jan 19Prepare ForwaderOverdue0/16moPlan: Jan 19–Jan 20---6mo
Mega Akses - Req.Battery - JABODETABEKProduct + InstalasiDeadline: Apr 10, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/14moPlan: Feb 26–Feb 27Preapare SubconOverdue0/14moPlan: Feb 27–Mar 2Prepare ForwaderOverdue0/14moPlan: Mar 2–Mar 2---4mo
INTERNAL | - MDCC Trial Full Schneider Device - ContainerProduct + InstalasiDeadline: Apr 20, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue8/96moPlan: Jan 6–Jan 8Actual: Jan 8Preapare SubconOverdue0/136moPlan: Jan 6–Jan 9Prepare ForwaderOverdue0/116moPlan: Jan 8–Jan 17---6mo
Internal - Smart rPDUProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/16moPlan: Jan 23–Jan 24Preapare SubconOverdue0/15moPlan: Jan 24–Jan 25Prepare ForwaderOverdue0/15moPlan: Jan 25–Jan 26---6mo
Mega Akses - BDF Power Tanah Merah (Add Battery)Product + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/14moPlan: Mar 11–Mar 12Preapare SubconOverdue0/14moPlan: Mar 12–Mar 13Prepare ForwaderOverdue0/14moPlan: Mar 13–Mar 13---4mo
Schneider Electric - LNGPPProduct + InstalasiDeadline: Apr 30, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/13moPlan: Mar 26–Mar 27Preapare SubconOverdue0/13moPlan: Mar 27–Mar 30Prepare ForwaderOverdue0/13moPlan: Mar 30–Mar 31---3mo
BDX - CGK1_Panel PDUProduct + InstalasiDeadline: May 21, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue1/26moPlan: Nov 9–Jan 14Actual: Jan 9Preapare SubconOverdue0/26moPlan: Nov 9–Jan 15Prepare ForwaderOverdue1/36moPlan: Dec 12–Jan 16Actual: Dec 12---6mo
Intan Mufakat Raya - GIS 150 KV Gandul II/PamulangProduct + InstalasiDeadline: Jun 10, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/14moPlan: Mar 20–Mar 23Preapare SubconOverdue0/14moPlan: Mar 23–Mar 24Prepare ForwaderOverdue0/14moPlan: Mar 24–Mar 24---4mo
Hitachi - ACP25035 - GI Satui 150kVProduct + InstalasiDeadline: Jun 19, 20261/4 aktivitas selesaiMembuat Inquiry Ke SupplierOverdue0/17moPlan: Dec 11–Dec 12Membuat PO SupplierDone1/1Plan: Jan 9–Jan 9Actual: Jan 9Update Report Jadwal Kedatangan BarangOverdue0/17moPlan: Dec 12–Dec 15Membuat Report Material Defect/ReturnOverdue0/27moPlan: Dec 12–Dec 15--7mo
Mega Akes - HUB Majalengka (Add Battery)Product + InstalasiDeadline: Jul 31, 20260/3 aktivitas selesaiMembuat PO SupplierOverdue0/14moPlan: Mar 10–Mar 11Preapare SubconOverdue0/14moPlan: Mar 11–Mar 12Prepare ForwaderOverdue0/14moPlan: Mar 12–Mar 12---4mo
Internal - Micro Data Centre EatonProduct + InstalasiDeadline: Jan 23, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jan 6–Jan 7Actual: Jan 7Preapare SubconOverdue0/16moPlan: Jan 6–Jan 7Prepare ForwaderOverdue0/16moPlan: Jan 7–Jan 8---6mo
Internal - Perbaikan Loading/Unloading Area Pintu BelakangProduct + InstalasiDeadline: Feb 27, 20261/3 aktivitas selesaiMembuat PO SupplierOverdue1/65moPlan: Feb 16–Feb 18Actual: Feb 18Preapare SubconDone1/1Plan: Feb 25–Apr 3Actual: Mar 30Prepare ForwaderOverdue0/13moPlan: Mar 26–Mar 27---5mo
Internal - Forecast Rack Server : (42U, 45U, 52U)Product + InstalasiDeadline: May 29, 20261/3 aktivitas selesaiMembuat PO SupplierDone3/3Plan: Feb 3–Feb 27Actual: Feb 27Preapare SubconOverdue0/34moPlan: Feb 3–Feb 27Prepare ForwaderOverdue0/34moPlan: Feb 4–Feb 28---4mo
Internal - MDCC 20 Feet POD Phase 2/IP65Product + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Feb 27–Feb 28Actual: Feb 27Preapare SubconOverdue0/14moPlan: Feb 27–Feb 28Prepare ForwaderOverdue0/14moPlan: Feb 28–Mar 1---4mo
Internal - Contaiment 50 UnitProduct + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Dec 9–Jan 27Actual: Dec 10Preapare SubconOverdue0/17moPlan: Dec 9–Dec 10Prepare ForwaderOverdue0/17moPlan: Dec 10–Dec 11---7mo
Internal - Pembuatan Bak Treatment, Hoist, Oven dan TrolleyProduct + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesaiMembuat PO SupplierDone4/4Plan: Nov 28–Feb 1Actual: Jan 30Preapare SubconOverdue3/55moPlan: Dec 11–Feb 2Actual: Feb 2Prepare ForwaderOverdue0/35moPlan: Dec 11–Feb 2---5mo
Wholesale - Panel DB - Dermaga BiakProduct + InstalasiDeadline: Jun 30, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/14wPlan: Jun 9–Jun 10Actual: Jul 7Preapare SubconOverdue0/14wPlan: Jun 10–Jun 11Prepare ForwaderOverdue0/14wPlan: Jun 11–Jun 11---4w
PT. NexWave_Panel TXDP & SDP AC_PO25090188Product + InstalasiDeadline: Jul 3, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Mar 23–Mar 24Actual: Mar 23Preapare SubconOverdue0/14moPlan: Mar 23–Mar 24Prepare ForwaderOverdue0/24moPlan: Mar 24–Mar 25---4mo
Hitachi - ACP25085 - Sebuku PLN NPCProduct + InstalasiDeadline: Jul 6, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: May 21–May 22Actual: May 22Preapare SubconOverdue0/11moPlan: Jun 4–Jun 5Prepare ForwaderOverdue0/21moPlan: Jun 5–Jun 8---1mo
Hitachi - GI 150kV kruengProduct + InstalasiDeadline: Jul 22, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29Preapare SubconOverdue0/11wPlan: Jun 29–Jun 30Prepare ForwaderOverdue0/21wPlan: Jun 30–Jul 1---1w
Pembuatan Robot AGVProduct + InstalasiDeadline: Jul 24, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jan 12–Jan 13Actual: Jan 13Preapare SubconOverdue0/16moPlan: Jan 12–Jan 13Prepare ForwaderOverdue0/16moPlan: Jan 13–Jan 16---6mo
BDX CGK3 - Electrical MaterialProduct + InstalasiDeadline: Jul 24, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 12Preapare SubconOverdue0/11wPlan: Jun 30–Jul 1Prepare ForwaderOverdue0/11wPlan: Jul 1–Jul 1---1w
DNA Teknologi Indonesia - Caging System DHIProduct + InstalasiDeadline: Jul 28, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jul 2–Jul 3Actual: Jul 2Preapare SubconOverdue0/12dPlan: Jul 3–Jul 6Prepare ForwaderOverdue0/12dPlan: Jul 6–Jul 6---2d
Hitachi - ACP25099 - GI 150kV TakengonProduct + InstalasiDeadline: Jul 31, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29Preapare SubconOverdue0/21wPlan: Jun 29–Jun 30Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1---1w
Kelinci Mas - DSS TallolamaProduct OnlyDeadline: Aug 7, 20264/6 aktivitas selesaiMembuat Inquiry Ke SupplierDone1/12dPlan: Nov 14–Nov 15Actual: Nov 17Membuat PO SupplierDone1/12dPlan: Nov 15–Nov 15Actual: Nov 17Preapare SubconOverdue0/18moPlan: Nov 15–Nov 15Update Report Jadwal Kedatangan BarangDone1/11dPlan: Nov 15–Nov 16Actual: Nov 17Prepare ForwaderOverdue0/18moPlan: Nov 15–Nov 15Membuat Report Material Defect/ReturnDone1/12dPlan: Nov 16–Nov 16Actual: Nov 188mo
Hitachi - ACP25105 - Seko IndokomasProduct + InstalasiDeadline: Aug 12, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 4Preapare SubconOverdue0/11wPlan: Jun 29–Jun 30Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1---1w
Hitachi - GI 150kV SribawonoProduct + InstalasiDeadline: Aug 25, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29Preapare SubconOverdue0/11wPlan: Jun 29–Jun 30Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1---1w
Hitachi - GI 150kV KolakaProduct + InstalasiDeadline: Aug 28, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 29–Jun 30Actual: Jun 29Preapare SubconOverdue0/21wPlan: Jun 29–Jun 30Prepare ForwaderOverdue0/11wPlan: Jun 30–Jul 1---1w
Demo/Mockup Panel Typetest Cubic, Eaton MV, Eaton LVProduct + InstalasiDeadline: Aug 31, 20261/3 aktivitas selesaiMembuat PO SupplierDone3/3Plan: Feb 3–Mar 20Actual: Mar 16Preapare SubconOverdue0/35moPlan: Feb 17–Feb 18Prepare ForwaderOverdue0/35moPlan: Feb 18–Feb 19---5mo
INTERNAL-Ruang Meeting Smart RoomProduct OnlyDeadline: Sep 15, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/13dPlan: Apr 23–Apr 24Actual: Apr 27Preapare SubconOverdue0/23moPlan: Apr 23–Apr 24Prepare ForwaderOverdue0/12moPlan: Apr 24–Apr 27---3mo
Internal - 29 Line AssemblyProduct + InstalasiDeadline: Feb 27, 20262/3 aktivitas selesaiMembuat PO SupplierDone1/112moPlan: Dec 31–Jan 1Actual: Dec 30Preapare SubconDone1/11moPlan: Jan 1–Jan 2Actual: Feb 2Prepare ForwaderOverdue0/16moPlan: Jan 1–Jan 2---12mo
Internal - Mini Data Center Rack (MDCR) from ScheneiderProduct + InstalasiDeadline: Mar 27, 20262/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Feb 20–Feb 21Actual: Feb 20Preapare SubconDone1/1Plan: Feb 21–Feb 22Actual: Feb 22Prepare ForwaderOverdue0/15moPlan: Feb 21–Feb 22---5mo
Schneider - Panel for PUSRI IIIB Project // E2010-96440Product + InstalasiDeadline: May 26, 20263/4 aktivitas selesaiMembuat Inquiry Ke SupplierDone1/1Plan: Oct 3–Oct 3Actual: Oct 3Membuat PO SupplierDone1/1Plan: Nov 6–Nov 6Actual: Oct 6Update Report Jadwal Kedatangan BarangDone1/1Plan: Oct 6–Oct 6Actual: Oct 6Membuat Report Material Defect/ReturnOverdue0/19moPlan: Oct 6–Oct 6--9mo
Siemens - UCC BP TangguhProduct + InstalasiDeadline: May 29, 20262/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Mar 5–Mar 6Actual: Mar 6Preapare SubconDone1/1Plan: Mar 6–Mar 9Actual: Mar 9Prepare ForwaderOverdue0/24moPlan: Mar 6–Mar 9---4mo
Moratel - Baterry Enersys 100 Ah PO 165347 - (300 Blok)Product OnlyDeadline: Aug 28, 20251/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Apr 7–Apr 7Actual: Apr 7-----
Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KWProduct + InstalasiDeadline: Mar 31, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Dec 10–Dec 15Actual: Dec 15-----
PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - SentulProduct + InstalasiDeadline: Jun 1, 20262/2 aktivitas selesaiMembuat PO SupplierDone1/12moPlan: Mar 18–Mar 25Actual: May 25Preapare SubconDone1/13moPlan: Mar 11–Mar 18Actual: Jun 19----3mo
PSN - Rack 20U UPS Hybrid + InverterProduct + InstalasiDeadline: Jun 3, 20261/2 aktivitas selesaiMembuat PO SupplierDone1/11dPlan: May 20–May 20Actual: May 21Prepare ForwaderOn Progress0/1Plan: Jul 20–Jul 27----1d
Kelinci Mas Unggul - Panel MK Single PhiProduct + InstalasiDeadline: Jun 10, 20263/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: May 18–May 19Actual: May 19Preapare SubconDone1/1Plan: May 19–May 20Actual: May 19Prepare ForwaderDone1/1Plan: May 20–May 20Actual: May 20---
Hitachi - ACP25076 - Single Phi BarruProduct + InstalasiDeadline: Jun 16, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Mar 9–Mar 10Actual: Mar 10-----
Hitachi - ACP25053 - DSS Maumere 150kVProduct + InstalasiDeadline: Jul 6, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Mar 9–Mar 9Actual: Feb 26-----
MIG - PO-26-0171 - Project Alladin Panel S110 & S510 - Panel DistributionProduct + InstalasiDeadline: Jul 8, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Aug 4–Aug 5Preapare SubconOn Progress0/1Plan: Aug 5–Aug 6Prepare ForwaderOn Progress0/1Plan: Aug 6–Aug 6---
Ekamas Mora Republik - POP Villa Beji Bali_ACPDB & DCPDBProduct + InstalasiDeadline: Jul 10, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Jul 21–Jul 22Preapare SubconOn Progress0/1Plan: Jul 22–Jul 23Prepare ForwaderOn Progress0/1Plan: Jul 23–Jul 23---
Hitachi - ACP25029 - GI Tolinggula 150kVProduct + InstalasiDeadline: Jul 13, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Apr 6–Apr 6Actual: Apr 6-----
Inti Bumi Mas - Panel VFD 132KWProduct + InstalasiDeadline: Jul 22, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jan 12–Jan 13Actual: Jan 12-----
Inti Bumi Mas - Panel FeederProduct + InstalasiDeadline: Jul 22, 20263/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Mar 23–Mar 24Actual: Mar 24Preapare SubconDone1/1Plan: Mar 24–Mar 25Actual: Mar 25Prepare ForwaderDone1/1Plan: Mar 25–Mar 25Actual: Mar 25---
PT. LTI_PO 26060314_ODC With Aircond 300W (1 Unit)Product + InstalasiDeadline: Jul 22, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Jul 16–Jul 17Preapare SubconOn Progress0/1Plan: Jul 17–Jul 20Prepare ForwaderOn Progress0/1Plan: Jul 20–Jul 20---
ATOZ - Dakota Electrical Fitout (Batam)Product + InstalasiDeadline: Jul 24, 20263/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 25–Jun 26Actual: May 21Preapare SubconDone1/1Plan: Jun 26–Jun 29Actual: Jun 26Prepare ForwaderDone1/1Plan: Jun 29–Jun 29Actual: Jun 26---
Hitachi - ACP26018 - GI KM17 Borneo IndobaraProduct + InstalasiDeadline: Jul 30, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/1Plan: May 20–May 20Actual: May 20-----
Mega Akses - Omadata SurabayaProduct + InstalasiDeadline: Jul 31, 20263/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: May 20–May 21Actual: May 4Preapare SubconDone1/1Plan: May 21–May 22Actual: May 6Prepare ForwaderDone1/1Plan: May 22–May 22Actual: May 7---
Ekamas Mora Republik - Open Rack 42U & Rack DCPDU 3U_PO# 174372Product + InstalasiDeadline: Aug 7, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Jul 13–Jul 14Preapare SubconOn Progress0/1Plan: Jul 14–Jul 15Prepare ForwaderOn Progress0/1Plan: Jul 15–Jul 15---
PT Roka Lane Asia - Rack Server 52U DWDM MMRProduct + InstalasiDeadline: Aug 21, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jul 17–Jul 20Actual: Jul 6Preapare SubconOn Progress0/1Plan: Jul 20–Jul 21Prepare ForwaderOn Progress0/1Plan: Jul 21–Jul 21---
ERCS DCAM - Loadbank PanelProduct + InstalasiDeadline: Aug 24, 20261/3 aktivitas selesaiMembuat PO SupplierDone1/1Plan: Jun 17–Jun 18Actual: Jun 18Preapare SubconOn Progress0/1Plan: Jul 1–Jul 10Prepare ForwaderOn Progress0/1Plan: Jul 13–Jul 17---
Mega Akses Persada - BDF Power Papahan KaranganyarProduct + InstalasiDeadline: Aug 28, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Jul 5–Jul 8Preapare SubconOn Progress0/3Plan: Jul 8–Jul 9Prepare ForwaderOn Progress0/1Plan: Jul 9–Jul 10---
Rumah Data Kita CGK11 - Rack Server 45UProduct + InstalasiDeadline: Sep 11, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Jul 30–Jul 31Preapare SubconOn Progress0/1Plan: Jul 31–Aug 3Prepare ForwaderOn Progress0/1Plan: Aug 3–Aug 3---
Internal - Stock Box Container 40 Feet ( 10 Unit)Product + InstalasiDeadline: Sep 21, 20261/1 aktivitas selesaiMembuat PO SupplierDone1/12wPlan: Jan 6–Jan 15Actual: Jan 26-----2w
Hitachi - ACP25111 - Muara Laboh Stage 2Product + InstalasiDeadline: Oct 23, 20260/3 aktivitas selesaiMembuat PO SupplierOn Progress0/1Plan: Jul 31–Aug 3Preapare SubconOn Progress0/1Plan: Aug 3–Aug 4Prepare ForwaderOn Progress0/1Plan: Aug 4–Aug 4---